Lead aprons and stepped flashing around a brick chimney on a tiled roof in Blyth

Case study

Chimney Leadwork and Roof Repairs in Blyth

Chimney leadwork fitted during the roof repairs in Blyth.

Black & White Property Services completed chimney and associated roof repairs at a residential property in Blyth in August 2024. Arranged through a property-management company, the work combined replacement leadwork, local repointing and gutter clearance.

Delivered by
Black & White Property Services
Site
a residential property in Blyth
Delivery route
through a property-management company
Project type
chimney leadwork and local roofing repairs

The challenge

The repair scope covered the junction between the chimney and the adjoining roof. Existing cement fillets needed removal across six sides of the chimney, with tiles around the chimney opened up to allow the new lead details to be fitted.

Access was required from both sides of the property, so tower access formed part of the agreed works.

Work completed

The team stripped out tiles around the chimney and removed the existing sand-and-cement fillets. New lead front aprons and stepped flashings were then fitted around the chimney.

Local repointing addressed the areas identified within the same repair scope. Gutters on both sides were cleared as part of the associated roof maintenance.

Bringing the leadwork, pointing and gutter clearance together allowed the specified chimney-junction repairs and adjoining maintenance to be completed within one package.

Result

The agreed works were completed, replacing the existing cement details with lead aprons and stepped flashings and completing the associated pointing and gutter clearance.

Opened roof junction beside the brick chimney
Opened roof junction beside the brick chimney.
Lead flashing around another face of the chimney
Lead flashing around another face of the chimney.