Black & White Facilities / Service area
Commercial Electricians in Newcastle and the North East
Plan electrical repairs, installations, lighting and testing for commercial premises in Newcastle and across the North East. We connect the work with your building systems, operating hours and shutdown requirements, with a defined scope and completion records.

Overview
Electrical decisions often affect several services. A replacement item of plant can need a supply assessment, controls work, isolation and commissioning. Identifying those connections early helps the client understand the whole job rather than treating the electrical connection as an afterthought.
Black & White Property Services repaired failed restaurant lighting at Thaikhun Metrocentre, including an LED conversion, and tested the affected fittings before handover. This example was delivered by the separate Property Services business. Lighting repair at Thaikhun Metrocentre.
For a reported fault, see commercial electrical repairs. For ongoing upkeep, explore planned maintenance.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

Individual electrical services
15 services

Illustration Commercial Electrical Repairs: investigate faults and define repairs to commercial installations.

Illustration Commercial Lighting: plan lighting around tasks, occupancy, controls and maintenance access.

Illustration Electrical Installations: provide new circuits, equipment supplies and installation alterations.

Illustration Electrical Testing and EICRs: assess existing installation condition and report findings.

Illustration Electrical Thermal Imaging: examine temperature patterns as part of a defined electrical assessment.

Illustration Emergency Lighting: address emergency-lighting design, maintenance, testing and defects.

Illustration Generators and Backup Power: assess alternative supply requirements and their operating interfaces.

Illustration Lightning Protection: arrange specialist work on lightning-protection systems and records.

Illustration LV and HV Systems: scope specialist low- and high-voltage infrastructure work and coordination.

Illustration Portable Appliance Testing: organise equipment inspection and testing around use and risk.

Illustration Power and Distribution: review how electrical capacity reaches the equipment and areas that need it.

Illustration Power Quality and Harmonic Analysis: investigate supply characteristics and their relationship to equipment performance.

Illustration Switchgear and Transformers: coordinate specialist inspection, maintenance and renewal of distribution equipment.

Illustration Temporary Power: plan an interim supply for defined work or operational requirements.

Illustration UPS and Uninterruptible Power Supplies: assess continuity requirements, equipment condition and system integration.
Examples delivered by Property Services
This example was delivered by the separate Black & White Property Services business. Two LED box fittings with legends were defective at a Dalton Park retail store. Black & White Property Services supplied and installed replacement fittings and checked an exterior door during the attendance. The specified lighting replacement and associated door-function check were completed. Replacement emergency-lighting fittings at a Dalton Park shop.
Which service do you need?
Describe the outcome or symptom before selecting the solution. An intermittent trip needs investigation; adding equipment needs a supply and installation assessment; uncertainty about an existing installation's condition calls for an appropriate inspection scope.
General lighting, emergency lighting and backup power serve different purposes. Explain the area, users and consequences of losing the service so the correct requirement can be established. Existing reports, circuit information and equipment specifications make that conversation more useful.
Repairs, maintenance and projects
Use Reactive Maintenance for faults needing assessment and repair, and Planned Preventative Maintenance for scheduled upkeep. Larger alterations connect with Mechanical and Electrical Projects and Building Services Upgrades.
A fault report can lead to a repair, further investigation or a replacement recommendation. Keep those stages distinct so the client knows what an attendance has established and which decision remains.
Planning electrical work
Provide the site address, affected system, existing drawings or reports and known operating constraints. Identify critical loads, retained specialists and who can authorise isolation. Shutdown planning must include the effect on connected systems and the checks needed before return to use.
Access, circuit information, equipment condition, working hours and the extent of testing affect price and programme. Completion records should describe the actual scope, checks and unresolved items. An attendance note alone does not explain the condition of the whole installation.
Work across sectors
Offices need work coordinated around occupants and shared services. Retail estates need trading and branch differences considered. Industrial premises need equipment loads, production interfaces and specialist responsibilities established. Our offering extends across all sectors.
Locations covered
We cover Northumberland, Tyne and Wear, County Durham and Tees Valley, including Newcastle upon Tyne, Gateshead, Sunderland, Durham, Darlington, Hartlepool, Middlesbrough, Stockton-on-Tees and Redcar and Cleveland. Supply every site address when planning portfolio work. View all locations.
FAQs
Can you help if we do not know which electrical service is needed?
Yes. Explain the symptom, affected area and operational impact. The first instruction can establish the investigation needed rather than assume a repair in advance.
Does electrical testing include repairing every finding?
The inspection and remedial work need defined scopes. Findings are reported, and additional repairs follow the agreed instruction and approval arrangements.
Can electrical work be coordinated with other trades?
Yes. Identify the wider project or equipment requirement so supplies, controls, access, making good and completion checks can be planned together.
Can work take place outside normal operating hours?
We agree the work window and access requirements when scoping the job. Include time for testing, reinstatement and client handback as well as the physical work.
Guides and further reading
Read What Is an EICR?, What Causes an Electrical Circuit to Trip? and What Is a Commercial Lighting Survey?. These explain different starting points for electrical work. Browse the knowledge centre.
Related content
Electrical work connects with HVAC and Refrigeration, Building Fabric and Shutdown and Out-of-Hours Maintenance. Explore all services, maintenance, projects, sectors and locations.
Discuss your electrical requirements
Contact Black & White Facilities with the site, system or area, desired result and available records. Include operating hours, access restrictions and any planned equipment changes so the work can be scoped around your premises.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.