Black & WhiteFacilities
Restored suspended light fitting above the dining area at Thaikhun Metrocentre

Case study

LED Lighting Repair at Thaikhun Metrocentre

The restored restaurant light fitting at Thaikhun Metrocentre.

Thaikhun at the Metrocentre reported failed lighting above a customer table and in another area of the restaurant. Black & White Property Services attended to diagnose the affected fittings and restore the lighting safely.

Delivered by
Black & White Property Services
Site
Thaikhun, The Qube, Metrocentre, Gateshead
Sector
hospitality and leisure
Project type
reactive lighting repair and LED conversion
Relevant services
commercial lighting, electrical fault diagnosis and reactive maintenance

Outcome

  • Two defective lamps replaced with low-energy LED alternatives.
  • Older fluorescent fitting adapted for an LED-equivalent lamp.
  • Existing ballast bypassed as part of the fitting conversion.
  • All affected lighting tested and left operational.

Have a similar requirement?

Explore commercial lighting, electrical fault diagnosis or contact Black & White Facilities with the property address, the problem and the result you need. Include photographs and access details where useful.

Illuminated pendant fitting within the restaurant
Illuminated pendant fitting within the restaurant.

Your building

Talk through what you need.

Tell us about the building, the work and any timing constraints.

Discuss your project