
Case study
Timber Window Restoration in Whickham
The timber window following sill, trim and glazing-putty repairs.
Black & White Property Services restored a timber window at a veterinary property in Whickham. The repair retained the existing window and focused on replacing decayed timber while preserving its appearance.
- Delivered by
- Black & White Property Services
- Site
- a veterinary property in Whickham
- Project type
- timber window repair and restoration
The challenge
Inspection found that the window sill had rotted through. The damaged sill and adjoining trim needed replacing with details that matched the existing pattern.
The windowpanes and joints also needed attention as part of the restoration.
Work completed
The team removed the damaged sill and surrounding trim. A replacement sill was custom made to match the window's existing pattern and fitted with replacement trim.
All panes were re-puttied and the joints sealed. Care was taken around the adjoining garden during the work.
Result
The damaged sill and trim were replaced, and the window was re-puttied and sealed. The repair retained the existing window's appearance while replacing the affected timber.
Your building
Talk through what you need.
Tell us about the building, the work and any timing constraints.
Discuss your project