Black & White Facilities / Service area
Pest-Control Services
Pest evidence needs to be connected to the building conditions that allow activity to continue. Facilities teams should establish the species, affected areas and responsibilities for treatment, monitoring and prevention before deciding whether the site needs targeted action or a recurring management programme.

Overview
Provide the observed problem and the operational result required, identifying the premises, affected users and changes in use. A revised tenancy, waste arrangement or building condition may alter the assessment rather than justify repeating the previous treatment.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

What the service can include
The offering includes commercial pest management, rodents, insects, birds and proofing. Instructions can address current activity, set a recurring programme or link exclusion work to repairs. Reporting separates the findings and measures completed from actions still required of the owner or site team.
What to consider
Review food sources, waste, damp conditions, deliveries and open routes alongside the treatment options. Leaving these conditions unchanged can undermine control. Bird interventions also require identification and a lawful approach; ordinary removal assumptions are inappropriate.
The proposal allocates instructed control activities and responsibilities retained by the property team. Related repairs or specialist tasks need separately defined scopes so the facilities lead knows who arranges them and which records will follow.
Before we visit
Send plans, sighting records and previous reports with details of food, waste and incoming goods. Identify sensitive activities and access limits, then agree the reporting route and who can authorise cleaning, proofing or operational changes.
How we help
Assessment links pest activity with likely contributing conditions. The plan assigns monitoring, control and prevention tasks; follow-up reviews new evidence together with recommended repairs. Where activity recurs, those findings inform a revised response rather than automatic repetition.
Portfolio reporting can use common categories while retaining the activity and operating conditions at each premises. Connect actions to their building or service area and name the escalation contact for decisions beyond the local team.
What affects cost and timing
Cost depends on the pest, its spread, the layout, access and selected approach. Distinguish monitoring, exclusion and contamination cleaning, with the proposed sequence, continuing inspections and additional building work made explicit.
Flag service hours, critical operations and periods when access would disrupt the site. The programme and price need to reflect phasing, any extra access provision and reports required to manage the work.
Sector applications
Coordinate pest work around employees and visitors in Offices, and trading and deliveries in Retail. Guest areas and food operations matter in Hospitality; teaching influences access in education. The complete offering supports all sectors, with the instruction based on the premises' activity.
Local coverage
Our pest-control coverage extends through Northumberland, Tyne and Wear, County Durham and Tees Valley. Included locations are Berwick-upon-Tweed, Alnwick, Morpeth, Hexham, Newcastle, Gateshead, Sunderland, Durham, Darlington, Hartlepool, Stockton-on-Tees and Middlesbrough; consult all locations.
For a contract covering several properties, identify local contacts and work restrictions by address. Keep building differences in the brief even when the estate uses a shared reporting arrangement.
Frequently asked questions
Which pest service should I request?
Report what has been seen and where. Assessment and identification determine whether monitoring, targeted treatment, bird management or exclusion is appropriate.
Does treatment include building repairs?
Repairs must be expressly included. The findings should describe proofing defects and identify the separate work needed to put them right.
Can prevention eliminate every future sighting?
Future introductions cannot all be prevented. Monitoring and prevention reduce opportunities and help the site respond when new evidence appears.
Can a single programme cover several premises?
A shared programme is possible, using consistent reports while preserving the risks, findings and accountable people for each premises.
Knowledge and guidance
The guide to planning commercial pest control sets out responsibilities for inspection, treatment, prevention and follow-up. Use Official guidance for the relevant control context and the Knowledge Centre for related guidance.
Related services and your next step
Individual scopes include Bird Control, Commercial Pest Management, Insect Control, Pest Proofing and Rodent Control. Connected building requirements can be explored through maintenance and Minor Works, alongside the full services and projects directories.
Use Contact Black & White Facilities to send the affected locations, pest evidence and existing records. Explain the operational outcome and working limits so the required investigation and instruction can be defined.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.