Black & WhiteFacilities
White waste pipework rerouted at a lower level beside a clinical tub table

Case study

Clinical Drainage Remediation at a Gateshead Veterinary Site

The rerouted waste connection after Black & White Property Services corrected the pipe fall.

The tub table was draining slowly and backing up through its waste connection. The initial instruction allowed for investigation and minor adjustment, while recognising that a deeper blockage or structural fault might require further work.

Delivered by
Black & White Property Services
Sector
veterinary and clinical environments
Project type
fault investigation and drainage remediation
Location
Gateshead area
Relevant services
commercial plumbing, drainage repairs and reactive maintenance

Diagnosis and approach

Black & White Property Services attended within the 24-hour response requirement. Inspection of the u-bend and connected pipework found that the original waste outlet was too high, leaving inadequate fall for reliable drainage.

Instead of treating the symptom, the team established a lower route through the supporting cabinetry and repiped the connection to create an effective gradient.

Work completed

  • Inspected the tub table, u-bend and connected waste pipework.
  • Identified inadequate pipe fall as the root cause.
  • Core drilled a new outlet at a lower level.
  • Rerouted and connected the waste pipework.
  • Tested the drainage under use and checked for leaks or renewed backup.
  • Left the clinical area clean, dry and operational.

Result

Testing confirmed free-flowing drainage with no further leakage or backing up. The repair was completed without specialist jetting or a return visit.

Have a similar requirement?

Explore commercial plumbing, drainage repairs, reactive maintenance or contact Black & White Facilities with the property address, the problem and the result you need. Include photographs and access details where useful.

Your building

Talk through what you need.

Tell us about the building, the work and any timing constraints.

Discuss your project