Case study
Case Studies by Sector
Browse work in retail, hospitality, veterinary and residential settings, and see how each job was adapted to the building and the people using it.
Explore completed work
- Planned and Reactive Maintenance at KIKO Milano, Newcastle
- LED Lighting Repair at Thaikhun Metrocentre
- Out-of-Hours Security Restoration at Wingstop Metrocentre
- Commercial Heating and Hot-Water Replacement at a Gateshead Veterinary Hospital
- Clinical Drainage Remediation at a Gateshead Veterinary Site
- Veterinary Safety Flooring at Robson & Prescott, Alnwick
- Phased Overnight Repainting at a 24/7 Veterinary Site
- Retail Opening Support at Eldon Square, Newcastle
- Parapet Flashing Repairs in Whitley Bay
- Chimney Leadwork and Roof Repairs in Blyth
- Buried Water-Pipe Repair and Reinstatement in Blyth
- Power Restoration at a Residential Park
- Multi-Trade Refurbishment in Sunderland
- Storm-Damaged Cladding Repairs in Newcastle
- Three-Storey Car Park Cleaning in Newcastle
- Heating Circulation Restored in Newcastle
- Retail Emergency Lighting Repairs at Dalton Park
- Multi-Trade Refurbishment in Seaham
- Roof Leak and Rainwater Repairs in Blyth
- Temporary Car Park Repairs in Backworth
- Reused uPVC Door Installation in Consett
- Timber Window Restoration in Whickham
Discuss your property
Browse all case studies or contact Black & White Facilities about the work you need.