
Case study
Out-of-Hours Security Restoration at Wingstop Metrocentre
The repaired rear-door lock at Wingstop Metrocentre.
Wingstop at Newcastle Metrocentre reported that its rear door could not be locked, leaving the premises insecure. Black & White Property Services attended out of hours within the four-hour response window.
- Delivered by
- Black & White Property Services
- Site
- Wingstop, Newcastle Metrocentre
- Sector
- hospitality and leisure
- Project type
- emergency security repair
- Relevant services
- commercial door locks, emergency attendance and reactive maintenance
Outcome
- Attended within four hours.
- Failed lock case and snapped cylinder diagnosed.
- Replacement commercial locking components installed.
- Door aligned and locking mechanism tested.
- Restaurant secured on completion.
Have a similar requirement?
Explore locksmith and ironmongery, reactive maintenance or contact Black & White Facilities with the property address, the problem and the result you need. Include photographs and access details where useful.
Your building
Talk through what you need.
Tell us about the building, the work and any timing constraints.
Discuss your project