Case study
Maintenance Case Studies
See how faults were investigated and repaired across commercial and residential properties, with practical results from each visit.
Explore completed work
- Clinical Drainage Remediation at a Gateshead Veterinary Site
- Planned and Reactive Maintenance at KIKO Milano, Newcastle
- Emergency Heating Repair at Robson & Prescott, Alnwick
- LED Lighting Repair at Thaikhun Metrocentre
- Out-of-Hours Security Restoration at Wingstop Metrocentre
- Parapet Flashing Repairs in Whitley Bay
- Chimney Leadwork and Roof Repairs in Blyth
- Buried Water-Pipe Repair and Reinstatement in Blyth
- Power Restoration at a Residential Park
- Storm-Damaged Cladding Repairs in Newcastle
- Heating Circulation Restored in Newcastle
- Retail Emergency Lighting Repairs at Dalton Park
- Multi-Trade Refurbishment in Seaham
- Roof Leak and Rainwater Repairs in Blyth
- Temporary Car Park Repairs in Backworth
- Reused uPVC Door Installation in Consett
- Timber Window Restoration in Whickham
Discuss your property
Browse all case studies or contact Black & White Facilities about the work you need.