Commercial Heating and Hot-Water Replacement at a Gateshead Veterinary Hospital

Replacement commercial heating and hot-water equipment installed by Black & White Property Services.

The hospital needed a replacement system capable of serving its radiator load and hot-water demand. Work had to be coordinated around a live clinical environment, with access and temporary service interruptions agreed with site staff.

Delivered by
Black & White Property Services
Sector
veterinary and clinical environments
Project type
plant replacement and building-services upgrade
Location
Gateshead area
Relevant services
commercial heating, hot-water systems, pipework alterations and commissioning

Our approach

The existing boiler, cylinder and associated components were removed before the new installation was set out against the retained building services. Black & White Property Services installed an Ideal EnviroMax 2 60kW commercial boiler, an Ideal pre-plumbed commercial cylinder and a commercial MagnaClean filtration unit. New and modified pipework connected the equipment to the existing system.

The supporting work included a purpose-made plywood backboard, a commercial-grade equipment platform, colour coding of existing gas pipework and protective finishing around rough edges. Removed equipment and waste were taken away through the agreed waste route.

Work completed

  • Removed the former boiler, cylinder, associated pipework and components.
  • Installed the 60kW commercial boiler, commercial cylinder and filtration unit.
  • Adapted pipework and connections to suit the retained building services.
  • Built the equipment support and completed protective finishing.
  • Commissioned and functionally tested the installation.
  • Gave the site representative an operational overview.

Result

The heating and hot-water system was operational following commissioning and functional testing, and the site representative received an operational handover.

Have a similar requirement?

Explore commercial heating installations, hot and cold water systems or contact Black & White Facilities with the property address, the problem and the result you need. Include photographs and access details where useful.

Your building

Talk through what you need.

Tell us about the building, the work and any timing constraints.

Discuss your project