Retail Emergency Lighting Repairs at Dalton Park

One of the replacement LED emergency exit signs at Dalton Park.

Black & White Property Services replaced two defective LED box fittings with legends at a retail store in Dalton Park in January 2026. The work was delivered through a retail-maintenance company.

Delivered by
Black & White Property Services
Site
a retail store at Dalton Park
Delivery route
through a retail-maintenance company
Project type
replacement LED legend fittings and an associated door check

The challenge

Two existing fittings were defective and needed replacement, including the legends displayed on the units.

Work completed

The team supplied and installed two replacement LED box fittings with legends. An exterior door was also checked and tested for functionality during the attendance.

Result

The defective units were replaced, completing the lighting repair alongside the exterior-door check.

Second replacement emergency exit fitting
Second replacement emergency exit fitting.