What Is a Dry-Riser Test?

A dry-riser test checks the condition and operation of pipework used by firefighters to deliver water to outlets within a building. A specialist inspection and pressure test helps identify leakage, damaged components and other faults.

Black & White Facilities2 min read
what is a dry-riser test?
what is a dry-riser test?

What the test covers

The specialist checks the installation and its accessible inlets, outlets, valves and associated components, then carries out the appropriate test for the system. The method and acceptance criteria should follow the relevant standard and installation requirements.

Prepare access

Arrange access to the inlet, landing valves and other areas needed for the test. Tell the tester about known defects, earlier reports, occupancy restrictions and arrangements for managing water and disruption.

Understand the report

  • Identify the building, system, date and tester.
  • Record the parts inspected, test method and results.
  • List defects and any areas that could not be assessed.
  • Set out remedial work and the action needed before a failed system returns to service.

Follow up defects

The person responsible for fire safety should assess the effect of any fault and arrange the necessary repair and precautions. Retain the report and subsequent work records together.

Further guidance

Use the relevant dry-riser maintenance standard and competent specialist advice for your installation. Read fire-safety responsibilities and guidance for people with fire-safety duties, or discuss the required work.