Tyne and Wear
Facilities management, maintenance, technical services and projects for premises in Tyne and Wear. Start with the support you need, explore completed work where available, and send us your site requirements.
Discuss this locationFacilities support in Tyne and Wear
Explore facilities management, planned and reactive maintenance and technical services for your premises. For a defined building change, see projects.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.
Property Services work across Tyne and Wear
These projects were delivered by the separate Black & White Property Services business. Each report describes the completed work and any remaining recommendations.
- Planned and Reactive Maintenance at KIKO Milano, Newcastle: A staff-basin water heater was replaced and, on a later visit, a loose, dripping tap was repaired at Eldon Square.
- Heating Circulation Restored in Newcastle: Two circulation pumps were replaced and existing valves cleaned and refitted, restoring heating circulation to the affected building zones.
- Storm-Damaged Cladding Repairs in Newcastle: Missing shiplap boards and window trim were replaced on the affected elevation of an apartment block.
- Three-Storey Car Park Cleaning in Newcastle: All three floors of a hotel car park were swept and jet washed, with additional sanitising in the specified areas.
- Retail Opening Support at Eldon Square, Newcastle: A stockroom bench, whole-store deep clean and equipment support helped prepare an Eldon Square shop for opening; cooling investigation remained separate.
- Clinical Drainage Remediation at a Gateshead Veterinary Site: A veterinary tub-table waste connection was rerouted at a lower level and tested for free-flowing drainage.
- Commercial Heating and Hot-Water Replacement at a Gateshead Veterinary Hospital: Replacement heating and hot-water equipment was installed and functionally tested while the veterinary hospital remained in use.
- LED Lighting Repair at Thaikhun Metrocentre: Failed lamps and an older fluorescent fitting were addressed and the affected restaurant lighting tested at the Metrocentre.
- Out-of-Hours Security Restoration at Wingstop Metrocentre: Failed locking components were replaced and door alignment adjusted to secure the rear door at the Metrocentre.
- Timber Window Restoration in Whickham: A custom-made sill and replacement trim repaired decayed timber, with re-puttying and sealing to retain the existing window.
- Temporary Car Park Repairs in Backworth: Temporary macadam and compacted aggregate repairs addressed local parking-surface defects; longer-term drainage and surfacing remained separate.
- Parapet Flashing Repairs in Whitley Bay: The specified felt flashing area at a managed residential building was renewed using tower access.
- Multi-Trade Refurbishment in Sunderland: Plumbing fittings, door repairs, ventilation and room decoration were completed within one managed-property repair package.
Explore service areas
See guidance for your premises type alongside the service you need.
Local context for Tyne and Wear
Tyne and Wear portfolios need records that identify the actual property and responsible organisation, even when sites share a regional service. The fire and rescue service covers five districts. Use that regional context alongside each building’s own contacts, access arrangements and maintenance responsibilities.
Tyne and Wear Fire and Rescue Service identifies Gateshead, Newcastle, North Tyneside, South Tyneside and Sunderland as its five districts. That shared service area is useful for organising regional information. It does not turn buildings across those districts into one estate or transfer an owner’s responsibilities to another party.
For a portfolio work order, retain the full address, local authority, occupier and approval contact for every site. Link common procedures to those individual records rather than replacing them with a regional label. If a task concerns fire precautions, identify the affected system and the person coordinating the premises’ arrangements, so repair records and follow-up actions reach the right building manager.
Wider coverage
For the wider coverage area, see North East England.
Other places covered in North East England: Northumberland, County Durham, Tees Valley.
Places within this area
These pages form this part of our coverage directory.
Discuss your site requirement
Send a facilities enquiry with the address, affected assets, priority, access contact and required work window. For several sites, include each address. Scope and availability are confirmed for the enquiry.
Discuss your requirements