Black & White Facilities / Service brief
Pitched Roofing
Slipped slates, missing tiles, loose ridge units and leaks on a pitched roof rarely stay isolated, and the felt, battens and timbers beneath may be affected too. Let us know how long the problem has been visible, whether it keeps returning and whether anything at the building changed first, so the immediate repair is kept apart from any wider investigation.

What the work can include
- Repairs to slate, tile or other coverings.
- Ridge, hip, verge and abutment work.
- Re-covering of roof slopes agreed in the scope.
The scope document defines the slopes and details covered, what is kept and the information handed over at completion. For a portfolio instruction every item carries its site and roof reference, keeping cost and later action traceable.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

Important decisions
One-off damage on a roof that is otherwise in good order can be repaired locally. Where slips and leaks keep returning, or the battens, felt or timbers have deteriorated, wider renewal may be the better use of budget. Defects are recorded against the rooms and assets beneath, with repair history and renewal ranking held per building.
Before we visit
Supply the covering type, building height, damage photographs and any loft-access details, plus the applicable site records, the effect on the building's use and the approved limit. Confirm the local contact and when work can take place without interrupting essential activity.
How the work proceeds
The enquiry establishes what the client wants achieved and which records exist. A survey confirms the repairs the covering needs and the boundary of the instruction. The agreed method and scope then fix sequence, protection below and access before work starts.
On completion the work is written up against the site or room reference, the outcome stated and any remaining action listed separately, so the record feeds the maintenance plan and future budgets.
What affects cost and timing
The main drivers are scaffolding, sourcing matching slates or tiles, work to the timbers or membrane beneath, and weather. These set crew, plant, order of work and duration; a photograph or approximate roof area seldom reveals the whole task.
Across a group of sites, put like tasks side by side on consistent access assumptions before combining them into one programme, and settle the temporary arrangements and the point at which extra work goes back for approval.
Applications across sectors
Warehouse roofs sit above stock and live operations that need protecting; offices call for care over occupied floors and finishes; schools and hospitality venues need the programme to fit around their users. The full range served is under sectors.
Local coverage
Sites across North East England fall within the area Black & White Facilities serves, from Northumberland and Tyne and Wear to County Durham and Tees Valley. Give the postcode and site-access details with the enquiry, whether the building is in Newcastle, Gateshead, Durham, Middlesbrough or elsewhere in the region. Full coverage is in the location directory.
Frequently asked questions
Does a missing tile mean the whole roof needs replacing?
Usually not. A single defect can normally be dealt with locally; the condition of the surrounding covering and the structure beneath determines whether anything wider is recommended.
What information helps define pitched roofing work?
The covering type, building height, damage photographs and loft-access details, plus the outcome wanted and any fixed access dates. Previous reports mean the work does not repeat what has been investigated or reopen what has been agreed.
What most affects the price and programme?
Whether scaffolding is needed, how easily matching slates or tiles can be found, what the timbers or membrane below require and what the weather allows. Quotations can only be compared fairly once the scope states which preparation, access and completion tasks each one includes.
How should the finished work be recorded?
Record the site and work reference, the slopes treated or components replaced and any action left open. Limitations belong in their own entry, apart from completed work, so the estate record remains dependable.
Guides and useful reading
The roofing planning guidance explains the reasoning that underpins this service. The guide on repair versus replacement shows how condition, cost and disruption can be compared when a building element needs work.
For the broader context in which roof work is carried out, the HSE roof-work guidance applies.
Related services and your enquiry
Go back to Roofing for the complete list in this group. Related pages are Roof Access and Safety Systems, Roof Inspections and Leak Detection and Roof Replacement. Browse all services, maintenance, projects, sectors and locations for the rest of the estate requirement.
Contact Black & White Facilities quoting the site reference, the operational urgency, the authorised contact and any records you hold. Covering type, building height, damage photographs and loft-access details let the next step be planned around the actual roof.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.