Black & White Facilities / Service brief
Gates, Barriers and Bollards
Collision damage, erratic movement, failed controls or a rerouting of site traffic are the usual reasons for attending to gates, barriers and bollards. Note when the problem was first noticed and what changed in how the entrance is used, run or laid out; the history tells you whether it is a new fault, a limitation that was always there or a planned improvement.

Overview
On an estate, describe each entrance separately. A gate that stalls at two sites may stall for different reasons, so keep each entrance's fault history and restrictions with it.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

What the work can include
The work covers assessing the equipment and the vehicle and pedestrian routes around it, checking the protective functions that apply, diagnosing faults, and scoping servicing, repairs or replacement. The scope should say what is in, what is out and what the completion record contains.
Quote your asset-register reference for every gate, barrier and bollard, so findings serve budget decisions, repeat work and later inspections without re-indexing.
Important decisions
Anything that moves under power needs a safety arrangement suited to the hazard it creates. Automating a gate that was previously manual is a design task, not just the fitting of a motor.
Before we visit
Send the equipment details, how it is operated, any incident or fault record, and the routes vehicles and pedestrians take through the entrance.
Give us your site contact, the technical approver and whoever will own the action list, and say in advance whether the visit needs a permit, an isolation or coordination with other trades.
How the work proceeds
The work area is segregated, isolation and an alternative route are agreed, the defined work is completed, and the operating and safety checks are documented.
Where the entrance is one of many, settle the sequence of sites and who is told when something material is found. Progress is reported entrance by entrance, so open actions stay in view until closed.
What affects cost and timing
Foundations, drainage, power supply, control interfaces, traffic management during the work and component condition all affect the price. How much can be priced from the enquiry depends on how complete your records are.
One programme can take in every entrance on the estate, provided access windows and operating dependencies at each site are confirmed rather than assumed. Decide beforehand how findings outside the scope are reported and priced.
Applications across sectors
Office and education estates need access rights that reflect who works there and who visits. Residential blocks are judged on whether the entry system serves residents and visitors reliably. At logistics sites, vehicle and pedestrian routes cannot be designed in isolation, and public-facing premises need entrances for all visitors. The settings covered appear in the sector range.
Locations covered
Work covers Northumberland, Tyne and Wear, County Durham and Tees Valley, including Newcastle upon Tyne, Gateshead, Sunderland, Durham, Darlington and Middlesbrough and the wider towns in the location directory. With more than one address, send the list of sites and a contact who can give access at each.
Frequently asked questions
Can vehicle detection loops protect every pedestrian?
+
They cannot. Protective measures have to be matched to the real hazards and to the people using the entrance; a loop that detects vehicles is not a general safeguard for pedestrians.
What information should I send about gates, barriers and bollards?
+
Send details of the equipment and how it is operated, any incident or fault history, and how vehicles and pedestrians move through the entrance. Say which site is involved and whether the decision is to investigate, to repair or to set up a programme.
What affects the price and programme?
+
The main cost factors are foundations and drainage, the power supply, the control interfaces, traffic management and how worn the components are. Where further investigation or additional work arises, agree a written scope before authorising it.
What should the completion information explain?
+
Expect it to cover the equipment and areas included, what was checked and done, any limitations and the open actions, written against your asset references so it can be picked up at the next visit.
Useful guidance and records
The decisions and records this category relies on are explained in how commercial access control works. For the process that takes a defect from first record to evidenced closure, see remedial-action tracking. Wider technical and management context is provided by the official guidance.
Related work and your next step
Access Control is a closely related service; for the category in full, see the Security, Access and Telecommunications overview. Planned servicing falls under maintenance, bigger changes under projects, and everything under services.
To scope the work with responsibilities and reporting settled up front, send Black & White Facilities the entrances involved, the findings so far and the operational constraints that apply. Discuss the requirement.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.