Typical activities
Investigating leaks, repairing damaged fixtures, resolving building-service faults and coordinating making good are typical reactive tasks. A recurring issue also prompts a review of earlier repairs and whether further investigation is needed.
Describe the effect on the building as well as the defect. These examples help connect a reported issue to the relevant work enquiry:
- Failed lighting or a reported electrical fault: commercial electrical repairs. Identify the affected area, equipment and symptoms already reported by the occupier.
- A leaking fitting or washroom problem: commercial plumbing. Include which facilities are affected and any earlier attendance or report.
- A damaged door, frame or timber component: joinery and carpentry. Describe the damage and the operational effect without assuming that adjustment or replacement is already the right answer.
- Water entering the building: roof inspections and leak detection. Provide the reported location and history so the investigation is not limited to an assumed cause.



