Black & White Facilities / Service brief
Commercial Lighting
Failed fittings, uneven light, uncomfortable glare and controls that do not fit occupancy are different problems. Replacing lamps alone does not address every one of them. Describe the area, the activities taking place and what building users experience.

Overview
Lighting needs also change after partitions, desk layouts or equipment move. A scheme that suited an open space can leave new rooms poorly served. Review the lighting with the revised layout rather than assuming the existing fitting positions will remain appropriate.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

What the work can include
The scope includes assessment of existing fittings and controls, repair of identified faults, replacement of unsuitable or obsolete equipment and installation alterations. It can cover a single area or a coordinated programme across premises, with the agreed measurements, design input and completion checks.
General lighting and emergency lighting need distinct consideration. A normal lighting replacement must account for any associated emergency function and its records. The brief also identifies related ceiling work, access equipment and disposal so the installation is coordinated beyond the fittings themselves.
Examples delivered by Property Services
This example was delivered by the separate Black & White Property Services business. Failed lighting affected customer areas at Thaikhun Metrocentre. Black & White Property Services replaced defective lamps and adapted an older fluorescent fitting for an LED-equivalent lamp. All affected fittings were tested and recorded as operational after the repair. Restaurant lighting repair at Thaikhun Metrocentre.
Choosing fittings, layout and controls
Start with the task and space, not the wattage of the existing lamp. Distribution, glare, colour appearance and the relationship with daylight affect usability. The selection needs to suit the working environment, mounting position and maintenance access.
Controls need an operating brief too. Occupancy detection, dimming and timed operation should reflect how areas are used and who needs manual control. A saving estimate requires a baseline for power, operating hours and the proposed arrangement; a lower-rated fitting alone does not establish an achieved reduction.
Before we visit
Provide plans, fitting details, fault history and information on working patterns. Identify areas with complaints, specialist visual tasks or restricted access. Explain how cleaning, maintenance and changes to occupancy currently affect the lighting.
For a portfolio, distinguish repeated standard requirements from site differences. Ceiling heights, daylight, existing circuits and room layouts can vary. Agree any survey or sample installation needed to check the proposal before adopting the same product widely.
How the work proceeds
We establish the lighting problem or intended improvement, review the existing installation and define the proposed work. The scope identifies fittings, controls, circuit changes, access and any linked ceiling or decoration tasks. Delivery is planned around the affected areas and users.
After installation, the relevant electrical and functional checks are completed. Controls are set up against the agreed use, and the handover explains operation and maintenance. Outstanding adjustments remain identifiable so users do not inherit a new system without knowing how to operate it.
What affects cost and timing
Fitting quantities, mounting height, access equipment, circuit condition and control changes affect cost. A straightforward replacement differs from a redesigned layout or a project requiring ceiling alterations. Existing product compatibility and availability also affect the practical programme.
Plan isolation, occupied-area protection and the sequence of work. In a building that continues operating, phased areas can help manage disruption, but each phase still needs a clear completion and handback point. Budget for the complete installation and records rather than comparing product prices alone.
Sector applications
Offices need lighting considered alongside desks, screens and changing occupancy. Warehousing and logistics needs working areas, heights and vehicle routes included in the assessment. Retail estates need product presentation and customer movement considered alongside staff tasks. Explore all sectors.
Locations covered
We cover Northumberland, Tyne and Wear, County Durham and Tees Valley, including Newcastle upon Tyne, Gateshead, Sunderland, Durham, Darlington, Hartlepool, Middlesbrough, Stockton-on-Tees and Redcar and Cleveland. Supply the exact sites and working windows when planning a programme. View all locations.
FAQs
Is replacing existing fittings with LEDs always a like-for-like job?
No. Check light distribution, controls, mounting, electrical compatibility and any emergency function. A change in technology does not remove the need to assess the installation and intended lighting result.
Can lighting controls be added without replacing every fitting?
The existing equipment and wiring determine the options. Assess compatibility and required functions before selecting controls or assuming that every fitting must be changed.
How are energy savings assessed?
Compare the existing power and operating pattern with the proposed arrangement, stating the assumptions. Actual savings need operating evidence after the change and should not be presented as guaranteed by a product choice.
Can occupied areas remain in use during the work?
The programme needs to address access equipment, isolation and protection of users. Agree phasing and temporary arrangements for the specific space rather than assuming a fitting replacement causes no disruption.
Guides and practical reading
Read What Is a Commercial Lighting Survey? to prepare the assessment, and What Is Fixed-Wire Testing? for the distinction between installation condition and lighting performance. Browse the knowledge centre.
Related work and enquiry
Explore Electrical Services, Emergency Lighting, Planned Preventative Maintenance and Building Services Upgrades. Browse all services, maintenance, projects, sectors and locations.
Contact Black & White Facilities with the areas involved, plans or photographs, current lighting concerns and operating hours. Explain the result you want and any portfolio requirements so the lighting scope can be developed around actual use.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.