Black & WhiteFacilities
Knowledge Centre Facilities Management Guides

What Is Integrated Facilities Management?

Integrated facilities management brings several building and workplace services into a coordinated management arrangement. The integration concerns instructions, responsibilities, information and performance across service lines, rather than simply placing several suppliers on the same list.

Black & White Facilities3 min read
what is integrated facilities management?
what is integrated facilities management?

What should be integrated?

A useful arrangement connects the route for raising work, the authority to instruct it, access to the property, completion records and client reporting. Service boundaries still need to be visible: combining oversight does not make technical responsibilities interchangeable.

For example, a planned plant replacement can affect power, ventilation, access, waste removal and cleaning. The programme should identify those interfaces before the work starts. Otherwise, each supplier can complete its own task while the overall requirement remains unfinished.

Integrated management and bundled purchasing

Bundled purchasing groups services commercially. Integrated management also joins up how those services operate. A single invoice or contract title does not establish that job records, priorities or escalation routes are consistent.

When assessing an arrangement, ask how a request involving more than one service is handled. There should be a clear lead, a sequence of activities and an understandable record of what remains outstanding.

What to establish before starting

  • List the services and sites included, along with retained contractors.
  • Define the client decisions and spending limits that remain in place.
  • Agree a common way to identify sites, assets and work orders.
  • Set response stages and escalation routes for each type of requirement.
  • Define reporting that shows both individual service performance and shared issues.
  • Agree record ownership and a workable handover process.

Existing data deserves attention at this stage. Different names for the same asset or building area make it harder to connect reports and spot recurring faults.

How to judge whether it is working

Look for fewer unresolved interfaces, clearer actions and usable information. Review a sample of jobs involving multiple services. Can the client see the original requirement, the work performed and the outstanding decision? Also examine repeat faults and delayed actions, rather than relying only on total job closures.

The commercial comparison should include coordination effort and the client's retained responsibilities. A lower headline management charge can still leave substantial work with the client; the scopes need to be compared on the same basis.

Common questions

Must every service be included?

No. Integration can cover a defined group of services. The links to services outside that group still need to be described.

Can existing contractors be retained?

Yes. The arrangement should establish who instructs each contractor and how its records and attendance connect with the managed service.

Is integrated FM only for multiple sites?

No. A single complex building can have many service interfaces. Portfolio size is one factor; operational complexity is another.

Related reading and services

Read what an FM contract should include and how performance is measured.

Explore Integrated Facilities Management, Contractor and Supply-Chain Management, all services and projects, and our sectors and locations.