For suspected gas escape or a carbon monoxide emergency in Great Britain, contact the National Gas Emergency Service, 0800 111 999, from a safe place and follow its directions. Emergency reporting precedes subsequent maintenance instructions.
Assess the effect of the problem
Uncontrolled leaks, hazardous electrical damage, unsecured external openings and essential-service failures commonly need urgent assessment. The setting determines their effect, so identical symptoms need not receive identical priorities.
Heating failure in unoccupied offices differs from failure affecting care occupants. A cupboard lock and a building entrance lock also have different consequences. Describe loss of function and exposure when assigning priority.
Identify affected users, unavailable areas and worsening conditions. State whether flow or equipment operation continues and whether access has been restricted. Never approach a hazard merely to collect photographs or labels.
Give a useful fault report
Provide the address, asset or exact location, symptoms, discovery time and site representative. Record authorised actions already taken and involvement of emergency responders or utilities. Identify access constraints, hazards and the client authoriser.
Good reporting separates immediate protection, diagnostic investigation and lasting repair. Each stage may need a different instruction or responding discipline.
Understand the attendance objective
Initial attendance addresses the immediate condition. Its result may be a full repair, isolation or an interim measure with restrictions. Require a clear handover of the state left and next action.
Keep remaining remedials open with ownership and an instruction route. Stopping water flow or isolating plant does not demonstrate full restoration of the affected service.
Agree priorities before the next incident
Define contacts, escalation and spending authority before incidents occur. Review arrangements after significant events, including a usable alternative when the usual site contact cannot be reached.
FAQs
Is every loss of heating an emergency?
Assess occupants, building conditions and alternatives. Vulnerable users or loss of an essential function can materially increase urgency.
Should I investigate before reporting a dangerous fault?
No. Report safely observable facts and follow emergency directions. Appropriate competent personnel should investigate the technical cause.
Does emergency attendance always finish the repair?
No. Isolation or temporary measures may remain while access, components or further work are arranged. The handover must identify the follow-up.
Related help
Explore emergency maintenance arrangements, post-attendance actions and effective fault reporting.



