An alarm, intermittent trip or loss of output may have more than one explanation. Replacing the most obvious component without understanding the operating conditions can leave the original issue unresolved.
We define what needs investigating and use the findings to establish the next step. A diagnostic visit may produce a confirmed fault, a repair scope or a requirement for further evidence under different conditions.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.
This example was delivered by the separate Black & White Property Services business. Occupied plots at a residential park lost power because of a fault in their connected supply. Black & White Property Services used sectional testing to identify and isolate a damaged cable section, then altered the working supply arrangement. Power was restored; permanent cable replacement and further site checks remained follow-on recommendations. Electrical fault finding and power restoration at a residential park.
This example was delivered by the separate Black & White Property Services business. Failed circulation pumps and non-return valve problems affected heat distribution at a Newcastle building. Black & White Property Services replaced two pumps, cleaned and refitted the existing valves, then refilled, vented, balanced and tested the affected circuits. Heating circulation was restored without unnecessary valve replacement. Heating circulation restored to affected Newcastle building zones.