Typical activities
Tasks may include reviewing rainwater routes and accessible drains, arranging suitable gutter clearance, examining paths or grounds, preparing heating or cooling servicing and identifying exposed pipework or fabric defects. Each activity needs the appropriate trade and safe means of reaching the work.



