Black & White Facilities / Service brief
High-Level Facade Cleaning
Staining and grime on upper elevations, and glazed or clad areas that cannot be reached from the ground, need an access plan before any cleaning method is chosen. Note when the build-up became noticeable and whether it is confined to one elevation, so the immediate clean can be separated from any investigation the facade may need.

What the work can include
- Reviewing facade construction and access options.
- A trial clean on a small section.
- Scheduled treatment of the agreed elevations.
Each instruction is written up to show the elevations in scope, features to be left untouched and the evidence expected at handover, with building and elevation recorded against every line so cost and follow-up stay traceable.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

Important decisions
The cleaning method has to be chosen together with the facade material and the means of access. Pedestrians and property below need protecting from falling water, residues and equipment. Agree elevations, frequency and reporting around how the building is occupied, keeping specialist access work separate from the routine cleaning contract.
Before we visit
Send elevation drawings, building height, the facade specification, access limits and the pedestrian routes beneath, together with site records, the likely impact on operations and the approval threshold. Confirm the on-site contact and when work can take place without disturbing critical activity.
How the work proceeds
An enquiry captures the outcome wanted and the information already held. The facade and access review then confirms conditions on each elevation and the boundaries of the instruction, and the agreed method statement fixes sequence, containment and access before mobilisation.
At handover, the completed elevations are logged against the site reference with the result, and items left open are listed apart from the finished work, ready for maintenance planning and budget setting.
What affects cost and timing
Access equipment, setup time, the surface being cleaned, containment and the hours the building operates are the principal cost drivers. They govern crew size, sequence and duration, and none can be read reliably from a photograph or a rough elevation area.
Across several buildings, check that each quote rests on the same task definition and access assumptions before merging them into one programme, and note the temporary arrangements each site requires and who signs off additional work.
Applications across sectors
In a school, access around teaching rooms in use has to be controlled; in an office, work above desks and meeting rooms needs coordinating; in hospitality, food areas and service times need protecting. The complete list is under sectors.
Local coverage
Black & White Facilities operates throughout North East England, covering Northumberland, Tyne and Wear, County Durham and Tees Valley. For buildings in Newcastle, Gateshead, Durham, Middlesbrough or any other listed area, include the postcode and access details. Every area served is in the location directory.
Frequently asked questions
Is it possible to clean every elevation in a single visit?
It depends on access, the weather, surface condition and the chosen method. Elevations often differ enough that each needs its own setup or treatment sequence.
What information is needed to scope high-level facade cleaning?
Elevation drawings, building height, the facade specification, access limits and nearby pedestrian routes, plus the result you want and any fixed access dates. Earlier reports stop the scope assuming things that have not been checked or agreed.
What has the biggest effect on cost and timing?
Access equipment, setup time, surface type, containment and operating hours come first. Ask for a scope that lists the preparation, access and completion work it covers, otherwise proposals cannot be compared like for like.
How should completed facade work be logged?
Record the site and works reference, the elevations treated or elements changed, and any residual action. Note limitations separately from completed work to keep the estate record accurate.
Guides and useful reading
For the reasoning behind how the service is specified, read the cleaning and hygiene planning guidance; the repair versus replacement guide shows how to weigh condition, cost and disruption when a building element needs attention.
Wider working context is available in the HSE cleaning guidance.
Related services and your enquiry
All services in this group are listed under Cleaning and Hygiene. Work that commonly runs alongside facade cleaning includes Hygiene Consumables and Replenishment, Industrial Cleaning and Kitchen Extract Cleaning; see all services, maintenance, projects, sectors and locations for the broader estate.
Send the site reference, operational priority, authorised contact and relevant records when you contact Black & White Facilities, with elevation drawings, height, facade specification, access limits and pedestrian routes where available, so the next step is scoped against the building as it stands.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.