Black & WhiteFacilities

Black & White Facilities / Service brief

Kitchen Extract and Grease Management

Grease deposits, odours, reduced capture or incomplete cleaning records call for assessment beyond the canopy face. Describe the cooking methods and operating hours, because conditions inside ducts and fans may differ and a previous cleaning interval may no longer suit a changed kitchen.

kitchen extract and grease management service
Illustration · Kitchen Extract and Grease Management

Overview

Explain the cleaning or grease-management outcome needed and the issue prompting the enquiry. Include the location, people affected and changed kitchen use so the assessment reflects the present requirement rather than repeating an earlier arrangement.

Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

Illustration accompanying the planning of commercial building work
IllustrationPreparing a service brief

What the service can include

The scope should identify the canopy, filters, duct sections, fans and access points included in inspection or cleaning. Record inaccessible sections and repairs required, with clear operator tasks and coordination of waste or drainage arrangements where relevant.

What to consider

Cleaning must follow the actual system route. Concealed or inaccessible sections need an access solution, not a claim that the entire route is clean. Extract grease and drainage grease involve different systems and maintenance requirements despite originating in the same kitchen.

Define the instructed work and the responsibilities retained by the kitchen or property team. Connected repairs and specialist activities need distinct scopes, including who arranges them and what records each party should receive.

Before we visit

Provide duct drawings, earlier reports, cooking activity and operating hours. Identify roof access, shutdown authority and known inaccessible sections, then agree who will take responsibility for defects and access improvements after the work.

How we help

Assess system boundaries and condition before defining cleaning and access tasks. The report should distinguish areas reached from remaining limitations, while handover identifies ongoing operator care and the evidence informing the next planned intervention.

For several kitchens, use consistent reporting and escalation without losing local contacts and operating requirements. Associate each action with its building or system and establish who decides on matters affecting the wider estate.

What affects cost and timing

System length, deposits, access, height and working hours affect the price. Access panels or repairs may need separate tasks. Compare quotations against the sections actually included and evidence supplied, rather than rely on a general kitchen-cleaning description.

Identify service hours, critical periods and activities that must remain operational. Reflect phased delivery, additional access arrangements and reporting in the programme and cost where these are needed to meet the kitchen team's constraints.

Sector applications

Cleaning arrangements in Offices need to consider staff and visitors, and in Retail, trading and deliveries. Hospitality requires coordination around food operations and guest areas; education around teaching and access. Check all sectors for the wider service and project offering appropriate to the site's activities.

Local coverage

Coverage for this work includes Northumberland, Tyne and Wear, County Durham and Tees Valley. Berwick-upon-Tweed, Alnwick, Morpeth, Hexham, Newcastle, Gateshead, Sunderland, Durham, Darlington, Hartlepool, Stockton-on-Tees and Middlesbrough are among the places listed in the all locations directory.

An estate cleaning brief should retain a contact and working restrictions for every address. Record the differences between kitchens within the shared instruction so local access and operational arrangements can be planned explicitly.

Frequently asked questions

Does cleaning the canopy cover the whole extract system?

No. The instruction must state which filters, ducts, fans and other system sections are included.

Can one interval suit every kitchen?

Set the interval against cooking activity, system condition and relevant requirements, and record the reason for that choice.

What if part of the duct cannot be reached?

Document the inaccessible section and specify the access improvement or follow-up action required.

Can reports support an estate maintenance plan?

Yes. Consistent system references help, provided reports preserve each kitchen's cooking duty and access limitations.

Knowledge and guidance

For cleaning scope, see how often kitchen extraction should be cleaned; for planning intervals, read setting maintenance frequencies. Further context is provided by Official guidance, with other material in the Knowledge Centre.

Related services and your next step

Review Commercial Kitchen and Catering Equipment and Commercial Kitchen Ventilation to distinguish cleaning needs from ventilation work. For associated requirements, use maintenance and Minor Works, or browse the wider services and projects directories.

Contact Black & White Facilities with the kitchen sites, available extract records and operational requirement. Include the outcome needed and working constraints so the cleaning scope and next action can be agreed.

Discuss the scope

Tell us what needs attention.

Share the site, the issue and any access requirements so we can discuss the next step.