Black & White Facilities / Service brief
Fire Curtains and Fire Shutters
Investigate a fire curtain or shutter against its intended protective function and controls. Failed deployment, damaged fabric or slats, obstructions and altered alarm interfaces need a clear history, so the site instruction distinguishes a current fault from an existing limitation or proposed change.

Overview
Retain an individual history for each installation in an estate instruction. Similar deployment problems do not establish a common cause, and local operating restrictions still apply.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

What the work can include
Identify the assembly and control arrangement, inspect visible parts and assess deployment and reset. Investigate faults before defining compatible repairs or replacement, with the included equipment, exclusions and handover record agreed.
Use current asset and location identifiers for curtain and shutter findings. The same references should remain useful when budgeting, commissioning follow-up work or inspecting again.
Important decisions
Establish the required fire protection and supporting product evidence. A shutter intended for security cannot simply be substituted for a fire shutter.
Before we visit
Send product information, operating instructions and maintenance reports, together with the alarm cause-and-effect details.
Name the access contact, person approving technical work and recipient of the action list. Establish permit, shutdown and contractor coordination requirements before booking the visit.
How the work proceeds
Clear the affected area for controlled deployment and check the specified interfaces. Document the final operating condition and any defects that remain unresolved.
Set the installation sequence across the estate and a route for escalating material findings. A completed test must not obscure repairs or other actions still outstanding at that site.
What affects cost and timing
Price depends on size and mounting height, controls, available components and the effect on trading or circulation. The records and enquiry show which tasks can be quoted and which require site assessment.
Group suitable work after checking local access windows and dependencies. Agree how new defects and their costs will be reported during the programme.
Applications across sectors
The premises’ fire arrangements and actual use guide the work. Consider the different access and evacuation needs of sleeping accommodation and offices, children and staff in education, and warehouse storage or layout changes. See the complete sector range.
Locations covered
We cover Northumberland, Tyne and Wear, County Durham and Tees Valley, with Sunderland, Gateshead, Newcastle upon Tyne, Durham, Darlington and Middlesbrough among the locations served. The location directory lists further communities. Include all addresses and local contacts for a programme across buildings.
Frequently asked questions
Can the opening remain in use during a deployment test?
Deployment changes access through the opening. Testing therefore needs an area under control and agreed arrangements for people moving around the work.
What information should I send about fire curtains and fire shutters?
Provide the product details, instructions, servicing reports and alarm cause-and-effect record. State the site and whether you need fault diagnosis, a repair proposal or a planned programme.
What affects the price and programme?
The assembly’s dimensions and height, controls, parts availability and effects on trade or movement influence scope. Further investigation or work needs definition before authorisation.
What should the completion information explain?
The handover should identify assemblies and areas covered, tasks completed and checks undertaken. Record limitations and remaining defects under the existing site and asset references for future visits.
Useful guidance and records
Use what should a fire logbook contain to organise the supporting records. For unresolved defects, Remedial-action tracking describes the evidence trail through to closure; consult official guidance for the broader technical and management context.
Related work and your next step
Consider Dry and Wet Riser Testing alongside the Fire and Life Safety overview where other fire measures are involved. Explore maintenance for recurring requirements, projects for coordinated changes and the complete services range.
Send Black & White Facilities your curtain or shutter list, site findings and operating constraints. Define the technical work together with reporting and responsibility arrangements. Make an enquiry.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.