Black & White Facilities / Service brief
Fire Extinguishers
Review extinguisher provision when equipment is missing or damaged, fire risks change or a service report recommends action. Explain the history and any alterations to site use or layout, so the instruction covers the actual equipment and the decisions required for the premises.

Overview
Keep the extinguisher history for each building within an estate instruction. Similar missing or damaged units can reflect different local issues, with different access and operating restrictions.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

What the work can include
Check the equipment schedule and positions, assess condition and carry out appropriate servicing. Identify replacements and record unit-specific actions, with agreed coverage, exclusions and completion documents.
Retain the site and asset references used in existing extinguisher records. Consistent identifiers support budget decisions, repeat work and the next inspection.
Important decisions
Choose extinguishers for the risks and arrangements for their users. Cylinders that look alike may hold different media and be intended for different hazards.
Before we visit
Supply the current fire risk assessment, extinguisher schedule and previous servicing record, including changes to processes or layout.
Before booking work, identify the site contact, technical approver and action-report recipient. Confirm any permits, shutdowns and coordination with other trades that affect attendance.
How the work proceeds
Inspect the specified areas and identify defective or unsuitable units. Record which equipment remains in position and which actions still need completion.
Set the building order for the programme and agree who receives significant findings. Keep replacement or other unfinished actions visible even when the inspection visit is complete.
What affects cost and timing
Price reflects unit types and quantities, replacements, specialist risks and access between buildings. The enquiry and records determine what can be quoted directly and what requires site assessment.
Group suitable servicing tasks while checking access and operational dependencies at each address. Confirm the route for reporting newly identified work and agreeing its price.
Applications across sectors
Base the instruction on building use and fire arrangements. Sleeping accommodation and offices differ in access and evacuation; education requires coordination around staff and children; warehouses need storage and layout changes considered. Explore the full sector range.
Locations covered
The area served includes Tees Valley, Tyne and Wear, Northumberland and County Durham, covering Middlesbrough, Darlington, Durham, Sunderland, Gateshead and Newcastle upon Tyne. Further towns and communities are shown in the location directory. Give the address and access contact for each estate site.
Frequently asked questions
Can all extinguishers be replaced with one common type?
Not necessarily. Check that the extinguishing medium, rating and suitability match the hazards and intended use before selecting a replacement.
What information should I send about fire extinguishers?
Send the risk assessment, equipment list and last service record, noting process or layout changes. Include the premises and whether you need an issue investigated, repairs planned or an ongoing programme.
What affects the price and programme?
Numbers and types of units, replacement requirements, specialist hazards and access affect price and timing. Authorise additional investigation or work only against a clearly described scope.
What should the completion information explain?
The record should show equipment and areas covered, servicing or other work completed and checks made. Note limitations and outstanding actions against site and asset references for use on future visits.
Useful guidance and records
Consult what should a fire logbook contain for the decisions and records supporting the work. Remedial-action tracking covers how an identified defect reaches documented closure, and official guidance provides wider technical or management information.
Related work and your next step
Explore Dry and Wet Riser Testing within the wider context of the Fire and Life Safety overview. Link ongoing servicing with maintenance, larger changes with projects, and use the full services list for other requirements.
Send Black & White Facilities the extinguisher or premises schedule, service findings and operating constraints. Set clear reporting and responsibility requirements alongside the instruction. Make an enquiry.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.