Black & White Facilities / Service brief
Doors, Windows and Glazing
Doors that bind, perished seals, cracked glass and hardware that no longer holds affect how a building is used, secured and kept weathertight. Note when the fault started and whether it is a single unit, a pattern across the site or the result of another change. Knowing that keeps the immediate repair distinct from any investigation or planned replacement programme.

What the work can include
- Assessment of how each unit operates.
- Repairs to hinges, closers, locks and seals.
- Replacement of glazing or the complete assembly where repair is not viable.
A written scope names the openings involved, the parts retained and the records expected at handover. On a multi-site instruction, reference each door or window to its building and floor so cost and follow-up remain traceable.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

Examples delivered by Property Services
This example was delivered by the separate Black & White Property Services business. A managed Sunderland property needed repairs to fittings, a reception-room door and several room finishes. Black & White Property Services repaired the door frame around the hinges, realigned and rehung the door, replaced fittings and completed the specified decoration and ventilation work. The agreed repair package was completed across the property. Door repairs and multi-trade refurbishment in Sunderland.
Important decisions
Separate what can be adjusted or repaired at component level from what genuinely needs replacing. Before specifying a change, check whether the unit has an escape, fire-resisting, accessibility or safety-glazing role the replacement must preserve. Group recurring faults by room or asset reference so reactive repairs and planned renewals are budgeted on separate lines.
Before we visit
Supply opening dimensions, frame material, photographs of the fault and what the door or window is there to do. Add the site records, the effect on operations or security and the limit of approval. Confirm the site contact and when an opening can be out of use without disrupting critical activity.
How the work proceeds
The enquiry sets the outcome needed and the information already available. An operational check then confirms how the unit performs and what the instruction does and does not cover. Sequence, temporary protection and access are confirmed before work starts.
On completion the work is logged against the site or room reference, the result recorded and anything outstanding kept on a separate list. Later maintenance and budgets rest on that record.
What affects cost and timing
Access, temporary protection, non-standard sizes, glass specification and hardware are the main cost variables. They determine labour, sequence and time; a photograph or a count of openings may not reveal the full scope.
Across several sites, compare like-for-like openings and access assumptions before grouping them into a programme. Agree temporary security or weather arrangements and where the line falls between the instruction and extra work.
Applications across sectors
Offices may need doors taken out of use one at a time, schools need work timed around pupils and escape routes, and hospitality and industrial sites have their own requirements for finish, cleaning and hours. The sectors pages describe the full range.
Local coverage
Black & White Facilities covers the whole of North East England: Northumberland, Tyne and Wear, County Durham and Tees Valley. Send the postcode and access notes with the enquiry for any property, from Newcastle and Gateshead to Durham and Middlesbrough or beyond. The location directory shows every area.
Frequently asked questions
Can a sticking door always be adjusted?
Adjustment works when the frame and leaf are still sound. Where the leaf has distorted, the hinges have failed or the opening itself has moved, a different repair is needed.
What information helps define doors, windows and glazing?
Opening dimensions, frame material, photographs of the fault and the purpose the unit serves are helpful details. State the outcome you need and any date the opening must be back in use. Reports already held avoid repeating what has been investigated.
What most affects the price and programme?
Temporary protection, access, hardware, glass specification and bespoke sizes are the starting points. Ask each proposal to state the preparation, access and completion work it includes, so they can be set side by side.
How should the finished work be recorded?
Log the site and work reference, the openings adjusted or components replaced and any action still due. Keep limitations out of the completed list so the estate record stays useful.
Guides and useful reading
The building fabric planning guidance walks through the decisions behind this service. Repair versus replacement lays out how condition, cost and disruption are compared when a unit is near the end of its life.
HSE construction guidance gives the broader working context.
Related services and your enquiry
The Building Fabric page lists the whole family. Related pages include Flooring, General Building Repairs and Handyman Services. Anything beyond this page sits under all services, maintenance, projects, sectors and locations.
Make an enquiry with Black & White Facilities, stating the site reference, priority, authorised contact and records. Frame material, opening sizes, photographs of the fault and what the unit is for, where known, allow the work to be scoped around the actual opening.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.