Black & White Facilities / Service brief
Handyman Services
Loose fixtures, damaged trims, small joinery faults and a backlog of minor jobs build up quickly across occupied rooms. Say when each item was first logged and whether it stands alone, keeps recurring or followed another change on site. That helps sort the straightforward tasks from anything that needs investigation or a trade in its own right.

What the work can include
- Review and prioritisation of the job list.
- Minor repairs and adjustments that fall within general handyman work.
- Fitting or replacing agreed items that do not need a specialist trade.
The written scope lists the items on the job list, what is to be left alone and the information returned once the visit is complete. Across several sites, give each task its site and room so cost and follow-up are traceable.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

Important decisions
Sort the genuinely simple tasks from those needing a qualified trade, design input or investigation first. A small job is not automatically a low-risk one. File recurring items by room or asset reference so day-to-day fixes and planned renewals are costed on separate lines.
Before we visit
Send a numbered job list, photographs, dimensions, details of anything the site is supplying and the access arrangements. Add the site records, the effect on room users and the approval limit. Give the site contact and the slots in which occupied rooms can be worked in without disturbing essential activity.
How the work proceeds
The enquiry sets out the results wanted and the information to hand. The job list is then reviewed to confirm which items fall within the instruction and where its limits sit. Order of work, protection and access are settled before the visit is booked.
At completion each item is recorded against its site or room reference, the result noted and anything not done held over separately. That supports later maintenance and budget decisions.
What affects cost and timing
Concealed fixings or services, the spread of tasks, materials and time spent moving between work areas are the main drivers. They set labour and duration; a photograph or a headline count of jobs may not capture the full scope.
Where the list spans several sites, check that the tasks and their access assumptions are alike before bundling them into one programme. Agree how occupied rooms will be handled and when an item found on site needs separate approval.
Applications across sectors
Offices may want rooms released a few at a time, schools need visits fitted around lessons, and hospitality and industrial premises set their own rules on finish, cleaning and hours. Every setting is listed in the sectors directory.
Local coverage
Black & White Facilities covers the North East of England, including Northumberland, County Durham, Tyne and Wear and Tees Valley. Add the postcode and access arrangements to the enquiry, whether the site is in Durham, Newcastle, Middlesbrough, Gateshead or another area listed. The location directory sets out the whole coverage.
Frequently asked questions
Can I book a list rather than one job?
Yes, and a list is a sensible way to do it. Mark the priorities and attach photographs so materials and any specialist interfaces can be considered before the visit is arranged.
What information helps define handyman services?
A numbered list, photographs, dimensions, details of site-supplied products and the access arrangements are the items to send. Note the result wanted and any dates the visit must fit. Earlier reports mean nothing is assumed about what has been looked at.
What most affects the price and programme?
Hidden fixings or services, the mix of tasks, materials and travel between work areas are the starting points. Proposals compare fairly when the scope makes clear what preparation, access and completion work each includes.
How should the finished work be recorded?
Record the site and work reference, the items completed or components changed and any task still open. Keep limitations apart from completed items so the estate record remains reliable.
Guides and useful reading
Building fabric planning guidance sets out the reasoning behind this service. Repair versus replacement helps when a worn item could be mended or swapped, weighing condition against cost and disruption.
The HSE construction guidance covers the wider working context.
Related services and your enquiry
The full family of services is on the Building Fabric page. Related pages are Joinery and Carpentry, Kitchens and Washrooms and Locksmith and Ironmongery. For everything else across the estate, start from all services, maintenance, projects, sectors and locations.
Enquire with Black & White Facilities, quoting the site reference, its operational priority, the authorised contact and any records. Photographs, a numbered list, dimensions, notes on any site-supplied products and the access arrangements, where available, let the visit be scoped around the actual property.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.