Black & WhiteFacilities

Black & White Facilities / Service brief

Air-Handling Units

Poor airflow, unusual fan noise, recurring alarms and rooms that no longer receive the expected conditions are reasons to investigate. Report whether the issue affects the whole area served or only particular outlets. The pattern helps identify whether the next task concerns the unit, distribution or local controls.

air-handling units service
Illustration · Air-Handling Units

Overview

An ageing casing, difficult filter access or repeated component failures can also justify a refurbishment review. A larger occupancy or changed room use needs assessment of the complete duty. Replacing one fan without checking the system requirement risks retaining the constraint that prompted the work.

Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

Illustration accompanying the planning of commercial building work
IllustrationPreparing a service brief

What the work can include

The scope covers the installed components: fans, filters, coils, dampers, heat-recovery sections, drainage, casing and controls where present. Not every air-handling unit contains the same equipment. The survey identifies the configuration and the tasks appropriate to it.

Work includes condition assessment, servicing, fault investigation, component replacement and defined refurbishment or renewal. Deliverables link findings to the unit and its sections, with operating information and remaining actions. Associated electrical, water, duct and control interfaces are recorded so repairs do not stop at the casing while overlooking the connected service causing the problem.

Refurbishment or replacement

A unit with a sound structure and replaceable components presents a different decision from one with extensive deterioration or inadequate capacity. Compare the condition, available space, access, intended duty and maintenance requirements. Retaining the casing is useful only if the proposed arrangement remains suitable and serviceable.

Replacement also requires a plan for getting equipment into position. Plantroom doors, roof access and structural interfaces can determine the practical installation method. The design should establish air volumes and treatment requirements before selecting equipment. A nominally similar unit is not automatically a suitable replacement for the existing system.

Before we visit

Provide drawings, equipment schedules, commissioning information, service records and control descriptions. Identify the areas served, operating hours and complaints. Include recent changes to filters, ductwork, room layouts or setpoints that could affect the observed behaviour.

Access planning covers safe plantroom or roof entry, isolation authority, lifting routes and space for maintenance. The site team should identify any activity relying on continued ventilation. Agree how that requirement will be managed during the work, including phased operation or a planned closure where needed. Customers should not open running equipment to investigate internal components.

How the work proceeds

We establish the unit configuration and service requirement, then assess the relevant components and operating conditions. Findings distinguish maintenance tasks, defective items and wider design or distribution questions. A repair or refurbishment proposal states what will change and which existing parts remain.

Installation work coordinates mechanical, electrical and controls tasks. Relevant checks and commissioning confirm the agreed result, with settings and component information recorded. Where airflow performance is part of the scope, the handover includes the measurements needed to understand it. Remaining distribution issues stay visible rather than being treated as resolved simply because the unit runs.

What affects cost and timing

Unit size, condition, access, replacement sections and control integration affect cost. Roof lifting, temporary weather protection and modifications to ducts or pipework create additional tasks. A component-only quotation should not be compared directly with a complete installation including those interfaces.

Programme planning identifies areas without ventilation or air treatment during work. Filters and other consumables need the correct specification and a clear supply basis. For major changes, agree removal, commissioning, operator instruction and updated records in advance. The completed job should give the building team the information needed to maintain the revised equipment.

Sector applications

Offices need supply arrangements aligned with occupancy and working hours. Education needs planned shutdowns coordinated with teaching and room use. Industrial premises require the distinction between general ventilation and process extraction to remain clear.

Healthcare and care environments need the actual room function and specialist requirements established in the brief. The full service and project range supports all sectors. An air-handling unit is assessed against its intended duty, not assumed to be suitable for every environment because it moves air.

Local coverage

We cover Northumberland, Tyne and Wear, County Durham and Tees Valley, including Berwick-upon-Tweed, Alnwick, Morpeth, Hexham, Newcastle, Gateshead, Sunderland, Durham, Darlington, Hartlepool, Stockton-on-Tees, Middlesbrough and Redcar.

For estates, provide separate unit schedules and access information for each building. Consistent records help compare condition while preserving the different duties of individual systems. View all locations.

Frequently asked questions

Does every air-handling unit heat and cool the air?

No. Its functions depend on the installed sections and connected services. Confirm the actual configuration before specifying maintenance or expecting a particular room condition.

Will changing filters fix low airflow?

It addresses one possible restriction. The investigation also considers fans, dampers, controls and the connected distribution where relevant. The result should explain the identified cause.

Can an existing unit be refurbished?

Assess the casing, components, duty and access first. The proposal should explain retained equipment, replacement parts and the checks demonstrating the completed arrangement.

Is an AHU service a complete ventilation assessment?

No. Servicing the unit and assessing airflow throughout occupied spaces are different scopes. Include the wider assessment where the question concerns room ventilation performance.

Knowledge and guidance

Read what an air-handling unit does and HVAC balancing. HSE ventilation guidance explains the workplace context for managing fresh-air provision.

Related work and enquiry

Explore HVAC and Refrigeration, Ductwork, Ventilation, Planned Replacement and Mechanical and Electrical Projects. Browse services, maintenance, projects and knowledge.

Contact Black & White Facilities with unit records, the areas served and the operational problem. Include access and shutdown requirements so the proposal covers the complete work sequence.

Discuss the scope

Tell us what needs attention.

Share the site, the issue and any access requirements so we can discuss the next step.