Black & White Facilities / Service brief
Chillers and Cooling Towers
Cooling-plant decisions need evidence from the connected system, not just the component showing a symptom. Facilities teams should bring together plant history, demand and operating constraints, keeping chiller servicing distinct from cooling-tower water management and the responsibilities needed to control associated risks.

Overview
Trace the system serving the affected space. Terminal performance may depend on the chiller, circulation, control strategy or heat rejection; work on one component can leave the issue unresolved if those interfaces are overlooked.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

What the work can include
The scope can include record review, condition inspection, performance investigation, specified servicing and repair or replacement planning. Allocate chiller, pump, control and heat-rejection activities individually wherever they fall within the instruction.
Reporting identifies assessed equipment, operating state, completed work and follow-up. Explicitly assign tower treatment, cleaning, monitoring and risk-management duties; a mechanical attendance does not imply that those responsibilities have been fulfilled.
Important decisions
Establish the plant arrangement and connections. Chillers may reject heat through air or a water circuit, whereas evaporative towers discharge heat through evaporation; the actual configuration determines the interfaces to review.
HSE's evaporative cooling guidance covers legionella controls, water treatment, cleaning and monitoring. A service entry in the plant history cannot stand in for the system's risk assessment and required control arrangements.
Investigate demand, circulation, controls and condition before choosing more capacity or replacement plant. Reduced output is evidence of a problem, not a calculation of the size needed.
Before we visit
Send schedules, schematics, operating trends, alarm details and service history. For evaporative plant, provide the responsible team's risk assessment, water-management records and current control scheme.
Identify served spaces or processes, available redundancy and acceptable interruptions. Define specialist input and the transfer of findings between engineering, water-management and operational owners. Assign missing system information as a task before work relying on it proceeds.
How the work proceeds
We establish the system limits and evidence before agreeing investigation or service tasks. Refrigerant activities follow the relevant qualified route; government guidance describes requirements applying to equipment containing F gas.
Coordinate isolation, water-system interfaces and plant availability in the programme. Handover separates completed tasks and operating checks from unresolved findings, returning updated records and named follow-up owners to the estates team.
What affects cost and timing
Plant configuration, capacity, refrigerant, access, testing and outages affect cost. Provide separately for water-management duties and specialist investigation. Larger work may also depend on crane access, supply lead times and temporary cooling.
Arrange checks under conditions representative of the required duty. Running unloaded demonstrates something different from measuring performance while the plant serves its intended demand.
Sector applications
In industrial premises, establish cooling duty and the process connections. Occupancy and controls influence investigations in offices. Critical environments require the operating conditions and contingency arrangements to be stated explicitly.
The wider offering covers all sectors, including retail, FM companies, healthcare, veterinary, education, leisure, construction, public and community premises, transport, energy and utilities, residential blocks, social housing and secure estates. Each instruction follows the property's actual function and requirements.
Local coverage
Chiller and tower enquiries can cover Northumberland, Tyne and Wear, County Durham and Tees Valley. Locations include Berwick-upon-Tweed, Alnwick, Morpeth, Hexham, Newcastle, Gateshead, Sunderland, Durham, Darlington, Hartlepool, Stockton-on-Tees and Middlesbrough; the full locations directory includes surrounding areas.
For plant across several premises, provide the operating contacts, addresses and local access arrangements needed to coordinate each site's work.
Frequently asked questions
Is a chiller the same as a cooling tower?
A chiller produces cooling and a tower provides heat rejection. They may work together, but an air-cooled chiller rejects heat by a different arrangement.
Does a cooling-tower service replace a legionella risk assessment?
Servicing does not replace the risk assessment or control scheme. Keep the purpose, scope and accountable people for each requirement clear.
Can a chiller be assessed while the building remains occupied?
Normal operation may support some investigations, while other tasks require isolation or interrupted cooling. Define the necessary conditions in the assessment and programme.
Does poor cooling mean the chiller needs replacement?
Replacement is not the only possible outcome. Loading, water circulation, controls or connected components may explain poor performance; investigate before deciding the remedy.
Knowledge and useful reading
Use what an HVAC maintenance contract should cover and what a legionella risk assessment involves to distinguish the equipment-maintenance brief from water-risk management, retaining both responsibilities where the system requires them.
Related services and your next step
The HVAC and Refrigeration category links with Commercial Refrigeration, HVAC Maintenance and Servicing, Condition-Based Maintenance and Mechanical and Electrical Projects when the plant findings require related maintenance or a defined project.
Explore all services, maintenance and all projects for work scopes, with sectors, locations and the Knowledge Centre providing the wider premises and guidance context.
Share the cooling duty, plant inventory, records and operating limits, naming engineering and water-management contacts. Contact Black & White Facilities can then be used to define the next assessment or work package.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.