Black & White Facilities / Service brief
Fan Coil Units
A noisy ceiling unit, uneven room temperature, weak airflow or water staining needs investigation of both the local equipment and its services. Record whether neighbouring units are affected. Several rooms losing cooling together raises different questions from one unit with a blocked drain or failed fan.

Overview
Changes to room layouts and furniture can also undermine performance. A partition placed between a unit and its intended room, or a return grille obstructed by storage, changes the airflow path. Reviewing the room arrangement can be as important as replacing a component inside the unit.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

What the work can include
The instruction covers accessible filters, fans, coils, valves, actuators, controls, drain trays and condensate arrangements as appropriate to the equipment. Diagnosis distinguishes local faults from issues with the heating or cooling supply. Replacement scope includes connections, supports, access and the checks required after installation.
Deliverables identify the unit, location, tasks completed and findings that need further work. For several units, use a schedule that records access failures and defects individually. A single statement that a floor has been serviced does not explain whether the concealed unit above a locked room was reached.
Local equipment and central services
A fan coil unit moves air across a coil to heat or cool the space. Common water-based arrangements depend on the building's heating or chilled-water services. Pipe configuration and controls determine the available operating modes; the design should be checked before promising simultaneous heating and cooling in different zones.
Replacing the fan coil will not resolve every central plant or water-distribution problem. Equally, a plant operating normally does not prove that each room unit has suitable flow and controls. Fresh-air provision also needs to be identified separately rather than assumed from the presence of a local fan.
Before we visit
Provide the unit schedule, model information, drawings, water-system details and control records. Include the room symptoms, when they occur and previous repairs. Identify the central plant serving the units and any recent changes to operating schedules or setpoints.
Access must allow useful servicing, not merely a view of the casing. Confirm ceiling panels, safe working space, furniture moves and protection beneath the unit. Identify water isolation arrangements and the person authorising interruption. Poor access should become a specific improvement action where it prevents routine maintenance or replacement.
How the work proceeds
We establish the affected units and review the available system information. The visit checks the local equipment and relevant service conditions within the agreed scope. Findings lead to defined cleaning, adjustment, repair or further investigation of the wider system.
For replacement, dimensions alone are not enough: duties, connections, airflow, noise and controls must suit the application. Work is coordinated with water and electrical isolations and ceiling access. Completion includes the relevant operational checks and a record of settings or changes. Any unresolved central-service issue remains visible so a local repair is not mistaken for full system restoration.
What affects cost and timing
Unit numbers, mounting position, ceiling access and component availability affect the price. Water-system work and controls changes add different tasks from cleaning filters. A programme covering many units should identify which activities are included and how additional defects are authorised.
Occupied-space planning includes protection from water and debris, safe access above desks and the period without heating or cooling. Replacement needs a route for removing the old unit and bringing in the new one. We agree reinstatement and reporting so the completed job includes the ceiling and records as well as the mechanical equipment.
Sector applications
Offices need local units matched to desk layouts and meeting-room use. Hospitality needs bedroom access, noise and condensate issues managed around occupancy. Education needs servicing programmed around teaching spaces and room changes.
Managing agents need tenant units distinguished from shared heating and cooling services. These examples sit within the full service and project range across all sectors. The approach scales from an individual defective unit to a scheduled estate programme.
Local coverage
We cover Northumberland, Tyne and Wear, County Durham and Tees Valley, including Berwick-upon-Tweed, Alnwick, Morpeth, Hexham, Newcastle, Gateshead, Sunderland, Durham, Darlington, Hartlepool, Stockton-on-Tees, Middlesbrough and Redcar.
Multi-site programmes retain each property's unit list and access restrictions. A common report format helps compare recurring defects without losing the details needed for individual repairs. View all locations.
Frequently asked questions
Does a fan coil unit provide fresh air?
Not automatically. Identify the building's ventilation arrangement and how it connects to the room. Local recirculation and a fresh-air supply are different functions.
Why does the fan run but the room stay warm?
Possible causes involve the local coil, controls, valves or the cooling supply. The investigation checks the relevant conditions before selecting a repair.
Can a unit be serviced through a small ceiling hatch?
The opening must give safe access to the components being maintained. If it does not, the scope should identify the access improvement needed rather than record an incomplete service as complete.
Should all units be replaced when one fails?
Not necessarily. Assess the defect and the condition of the wider group. A local repair and a planned replacement programme are different decisions supported by different evidence.
Knowledge and guidance
Read HVAC balancing explained and commercial mechanical plant maintenance. HSE ventilation guidance explains the separate need for adequate workplace ventilation.
Related work and enquiry
Explore HVAC and Refrigeration, Air-Handling Units, Air and Ventilation Balancing, Planned Preventative Maintenance and Building Services Upgrades. Browse services, maintenance, projects and knowledge.
Contact Black & White Facilities with the unit schedule, affected rooms and available access. Include central-system information so the scope addresses local equipment and its dependencies.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.