Black & White Facilities / Service brief
Backflow Prevention and RPZ Valves
A new equipment connection, changed process, water-company notice or inherited valve without test records can prompt assessment. The question is what could enter the drinking-water supply if flow reverses, not simply which valve will fit the available pipe.

Overview
Changes downstream matter. Equipment, chemicals or operating conditions can alter the contamination risk even when the incoming connection remains unchanged. Review the intended use before treating an existing device as suitable protection for a new application.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

What the work can include
The scope can include reviewing system arrangements, identifying protection requirements, coordinating water-company notification and consent, and arranging installation, testing or repair. The particular device, connected equipment and responsibility for ongoing testing are named in the instruction.
Outputs include the assessment basis, relevant consent information, equipment references, commissioning or compliance-test records and follow-up actions. The maintenance programme needs the actual due date and report destination, so a test does not become an isolated visit with no continuing owner.
RPZ protection and its limits
An RPZ, or reduced pressure zone valve, is a mechanical backflow device. Water Regs UK identifies protection against back pressure and back siphonage for risks up to fluid category 4. It is not category 5 protection. Read the current RPZ guidance.
The correct arrangement follows the assessed risk and the water undertaker's requirements. Point-of-use protection and wider site protection are different decisions. The design also needs to consider operation, maintenance access and any effect on the supplied equipment, rather than selecting a device from pipe size alone.
Before we visit
Provide drawings, details of the connected process, existing valve information and correspondence from the water company. Include previous test reports, repair history and the condition of consent where available. Identify any alterations since the last assessment or test.
Confirm the supply boundary, isolation arrangements and the activity affected by an interruption. Access for the competent tester and the practical installation conditions need to be established. Agree who handles notification, receives reports and arranges action if the device does not meet its required test criteria.
How the work proceeds
We establish the water-system use and protection question, review existing records and coordinate the appropriate assessment and technical work. Installation or alteration follows the relevant consent and installation requirements, with commissioning and compliance testing arranged through a competent RPZ tester.
The handover records the device, test outcome and any remedial or follow-up requirement. Water Regs UK states that test intervals are set by the local water undertaker and are at least annual. The programme records the actual required date and submission arrangements rather than assuming every valve has identical conditions.
What affects cost and timing
Assessment complexity, device size, access, pipework alterations and test or repair requirements affect cost. A straightforward compliance test differs from resolving a missing consent record, correcting an unsuitable installation or changing the protection arrangement for a new process.
Allow time for water-company coordination where required and plan the interruption with the affected users. Spare parts, additional testing and reinstatement need clear inclusion. A quotation should explain whether the task is a test, repair, installation or wider design assessment so approvals match the actual work.
Sector applications
Industrial premises need process connections and contamination risks identified. Education needs equipment and specialist-use areas assessed. Healthcare and care needs the relevant system and user requirements incorporated into the protection brief.
These examples sit within the full sector range. Our service and project offering supports the sectors we serve, with the device and technical route selected for the actual water use and assessed risk.
Locations covered
We cover Northumberland, Tyne and Wear, County Durham and Tees Valley, including Berwick-upon-Tweed, Alnwick, Morpeth, Hexham, Newcastle upon Tyne, Gateshead, Sunderland, Durham, Darlington, Hartlepool, Middlesbrough, Stockton-on-Tees and Redcar and Cleveland. View all locations.
For estates, provide valve references and water-company records by site. Keep each device's consent, test date and connected application together so changes can be assessed accurately.
Frequently asked questions
Can an RPZ valve protect against fluid category 5 risks?
No. Its stated protection extends up to category 4. The assessment must identify a suitable arrangement for higher-risk applications rather than treating an RPZ as universal protection.
Is a valve installation enough without ongoing testing?
No. RPZ arrangements include commissioning and compliance testing, with continuing tests under the water undertaker's conditions. Keep those requirements in the maintenance programme.
Can a changed process keep the same protection automatically?
The new use needs assessment. A changed downstream risk can affect the required protection even if the pipe and existing valve are unchanged.
What if an RPZ test identifies a failure?
The competent tester's findings and required action must reach the responsible person. Arrange the appropriate repair, verification and water-company communication under the applicable requirements.
Guides and practical reading
Use the Water Hygiene Checklist to organise system records and read What Is Remedial Action Tracking?. Browse the Knowledge Centre.
Related services and enquiry
See Plumbing and Water, Commercial Plumbing, Water Treatment, Statutory Maintenance and Compliance Remedial Works. Explore all services, maintenance, projects, sectors and locations.
Contact Black & White Facilities with the process details, device records and water-company correspondence. Include the supply and operational contacts so the assessment and work can be coordinated.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.