Black & White Facilities / Service brief
Biohazard and Trauma Cleaning
An incident involving bodily fluids, sharps or a trauma scene leaves an area that cannot simply go back into use. The space needs to be held, assessed and cleaned under controlled conditions before anyone returns. Tell us when the incident occurred, whether the area is still secured and what else on site is affected.

What the work can include
- An assessment of what is contaminated and how far it extends.
- Specialist cleaning to the agreed scope, with affected materials removed where they cannot be cleaned.
- Waste routes and a handover of the area once the work is done.
A written scope records which areas are treated, which items stay in place and what is reported at the end, with a site and location reference on each item so cost and follow-up sit against the right building.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

Important decisions
Decide first who controls access and who can authorise entry while the area remains contaminated. Set the limits of the cleaning scope, note any restriction where an investigation is open and confirm the route for contaminated waste. Record the incident clean as a specialist task, separate from routine visits.
Before we visit
Give the nature and location of the incident, any access restrictions and what is known about the contamination, leaving out unnecessary personal details, with relevant site records, the effect on operations and any limit on local approval. Name the on-site contact and the windows in which work can happen without stopping critical activity.
How the work proceeds
The enquiry fixes the outcome needed and gathers what is already known. An assessment then confirms the contamination and sets the practical boundaries of the instruction. Method, sequence, protection and access are agreed in writing before anyone starts.
At completion the work is logged against the site and room reference, the result recorded and anything left outstanding listed separately from what has been done, which feeds later maintenance planning and the budget.
What affects cost and timing
Extent of contamination, affected materials, restricted access and specialist waste handling are the main variables. Together they set the resource, the order of work and the time on site; a single photograph or a rough area rarely tells the whole story.
With several sites in play, line up equivalent tasks and access assumptions before rolling them into one programme, and decide the interim arrangements and when additional work would need fresh approval.
Applications across sectors
In an office the work has to fit around desks and meeting rooms; in a school or college, access is controlled while nearby rooms stay in use; in hospitality, food areas and service times shape the plan. The full range is set out under sectors.
Local coverage
Black & White Facilities works across North East England, taking in Northumberland, Tyne and Wear, County Durham and the Tees Valley. Include the postcode and access arrangements, whether the building is in Newcastle, Gateshead, Durham, Middlesbrough or elsewhere in the region; the location directory shows every area served.
Frequently asked questions
Should our own staff clean up before anyone assesses the area?
No. Nobody should be exposed to a contamination risk that has not been assessed. Keep the area secured, restrict entry and pass on the incident details so a cleaning plan can be put together.
What should the enquiry include for a biohazard or trauma clean?
The type and location of the incident, any access restrictions and what is known about the contamination, plus the result you need and any fixed dates. Reports already on file stop the scope repeating work already done.
What drives the cost and timescale?
The extent of contamination, the materials involved, how hard the area is to reach and the waste handling required. The scope should make clear which preparation, access and completion tasks are in, so proposals are compared on equal terms.
What should the completion record show?
The site and work reference, the areas treated or items removed and anything still to be done. Keep limitations in their own section so the estate record stays accurate and usable.
Guides and useful reading
The cleaning and hygiene planning guidance sets out the decisions behind any cleaning specification. Repair versus replacement covers how to weigh condition, cost and disruption where an element needs attention rather than cleaning.
HSE cleaning guidance gives the wider working context.
Related services and your enquiry
Cleaning and Hygiene lists every service in this group. Nearby options are builders and post-construction cleaning, carpet and floor cleaning and commercial contract cleaning. For the wider requirement, see all services, maintenance, projects, sectors and locations.
Contact Black & White Facilities with the site reference, how urgent the matter is operationally, who is authorised to instruct and which records exist, plus the incident type and location, access restrictions and what is known of the contamination, so the next step is scoped around the actual site.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.