Black & White Facilities / Service brief
Commercial Contract Cleaning
Missed areas, uneven results and a building whose occupancy has changed since the contract was written are usually signs that the specification needs revisiting. A clear task schedule, agreed frequencies and a standard that can be checked give both sides something to measure against. Describe the buildings, how they are used and where the current arrangement falls short.

What the work can include
- Area-by-area task schedules.
- Cleaning visits on a planned frequency.
- Consumables and quality checks, where these form part of the contract.
The scope document sets out the areas covered, any items excluded and the information reported after each period, with a site and location reference on each item for a contract across several sites.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

Important decisions
Decide what is cleaned, how often and to what standard someone can observe on a walk-round. Periodic deep cleans and specialist tasks belong in their own line of the specification, not inside the routine visit. Frequencies and reporting should follow how each area is actually occupied, and be revisited when the building's use changes.
Before we visit
Supply floor plans, occupancy levels, opening hours, surface types and the current cleaning concerns. Attach relevant site records, describe the effect on operations and state any approval limits. Name the local contact and the windows in which cleaning can run without interfering with critical activity.
How the work proceeds
The enquiry defines the standard required and gathers what is already documented. A walk-round then tests the proposed area and task schedules against the building and sets the practical limits of the contract. Sequence, protection and access are fixed in the agreed scope before visits start.
Completion for each period is recorded against the site and room references, with the result logged and any outstanding item listed separately. That record feeds the maintenance plan and budget.
What affects cost and timing
Floor area, task frequency, how intensively the building is used, access and whether consumables are supplied matter most. They determine the labour, the visit pattern and the time on site; a floor area or photograph on its own will not define the contract.
Build a multi-site contract from tasks and access assumptions that genuinely match before combining sites into one programme, and set out the interim arrangements and the point at which additional work is raised.
Applications across sectors
Office contracts work around desks and meeting rooms; education contracts run under controlled access while rooms are occupied; hospitality contracts have to respect food areas and service times. The sectors pages set out the full range of settings and the questions each raises.
Local coverage
Black & White Facilities covers sites across North East England, in Northumberland, Tyne and Wear, County Durham and the Tees Valley. Whether the building is in Newcastle, Gateshead, Durham, Middlesbrough or another listed area, add the postcode and access details; the location directory lists the full coverage.
Frequently asked questions
Does a cleaning contract cover deep cleans automatically?
Only if they are written in. Routine cleaning, periodic treatments and specialist tasks each need their own frequency and scope in the specification.
What information helps set up a cleaning contract?
Floor plans, occupancy, opening hours, surface types and the current cleaning concerns, plus the standard you expect and any fixed dates. Existing reports or audits help avoid assumptions about what has already been agreed.
What most affects contract price and programme?
Area, task frequency, usage intensity, access and supplied consumables. Make sure the scope states what preparation, access and completion work is inside the price, so competing proposals are measured on the same footing.
How should the work be recorded?
Against the site and work reference, showing the areas covered and any remaining action. Limitations are noted apart from completed work, which keeps the estate record dependable.
Guides and useful reading
The cleaning and hygiene planning guidance explains the decisions behind a contract specification. Where a fixture or finish is worn beyond what cleaning can restore, repair versus replacement sets out how condition, cost and disruption are weighed.
The HSE's cleaning guidance covers the wider working context.
Related services and your enquiry
Cleaning and Hygiene covers every service in this group. Services that often sit alongside a contract are deep specialist cleaning, fire, smoke and mould remediation and flood and sewage cleaning. All services, maintenance, projects, sectors and locations cover the wider requirement.
Contact Black & White Facilities with details of the sites, the priority, the person who can authorise work and any existing records, plus floor plans, occupancy, opening hours, surface types and current cleaning concerns where you have them, so the next step is scoped around the actual buildings.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.