service page
Battery Storage
A proposed solar installation, changing demand or a requirement to shift electricity use can justify a storage assessment. Establish what the battery should do and when. Energy capacity, power output and backup capability are different specifications, so a single quoted capacity does not describe the complete solution.
Discuss your requirementsDefined services, clearly scoped.
Overview
Describe the outcome required as well as the immediate issue. The starting information should identify the location, people affected and any change in use, so the assessment addresses the current requirement rather than simply repeating the previous arrangement.
What the service can include
The brief covers demand and generation information, equipment position, electrical interfaces, controls and the proposed operating strategy. It identifies installation, commissioning, monitoring and maintenance requirements. Connection and fire-safety considerations must be addressed for the actual equipment and location.
Decisions that shape the service
A battery does not automatically provide electricity during a mains outage. Backup operation needs an expressly designed arrangement and suitable loads. Financial outcomes depend on usage, tariffs, losses and degradation; assumptions should remain visible rather than be presented as guaranteed savings.
The proposal identifies the responsibilities that remain with the site or property team and the work included in our instruction. Connected repairs and specialist activities receive their own clear scope, so each person understands what they must arrange and what records they will receive.
Assessment and preparation
Provide interval demand, generation records, electrical drawings and the operating objective. Identify critical loads, site access and the team responsible for energy controls. Agree which scenarios the feasibility work should compare.
How the service proceeds
We assess the intended duty and site information, then define options and required interfaces. The selected scope includes the relevant connection process and commissioning. Handover records operating modes, limits, maintenance and ownership.
For several sites, we agree consistent reporting and escalation while retaining local contacts and operating requirements. Each action stays connected to its building or service area, with a named route for decisions that affect the wider operation.
Cost, timing and disruption
Capacity, power, location, electrical changes and control integration affect cost. Network requirements and ongoing support can add work. Compare the complete arrangement and operating assumptions, including replacement and maintenance considerations.
Tell us about operating hours, critical periods and the activities that must continue. The programme and price should reflect those constraints, including any phased delivery, additional access arrangements and reporting needed by the operational team.
Sector applications
Offices need work coordinated with staff and visitors. Retail needs trading and deliveries considered. Hospitality brings guest areas and food operations into the brief, while education needs access planned around teaching. Our complete service and project offering supports all sectors, with the arrangements based on each site's actual activity.
Local coverage
We cover Northumberland, Tyne and Wear, County Durham and Tees Valley, including Berwick-upon-Tweed, Alnwick, Morpeth, Hexham, Newcastle, Gateshead, Sunderland, Durham, Darlington, Hartlepool, Stockton-on-Tees and Middlesbrough. View all locations.
For a multi-site requirement, provide the local contact and working restrictions for each address. A common service brief still needs the differences between premises recorded.
Frequently asked questions
Will any battery keep the building running in a power cut?
No. Backup must be expressly designed, with the loads and operating limitations defined.
Is battery capacity the same as output power?
No. Capacity describes stored energy; power describes the rate at which it can be delivered.
Are savings guaranteed?
No. The assessment depends on demand, tariffs, generation and equipment performance.
Can storage support several site priorities?
The control strategy must define priorities and trade-offs rather than assume every objective can be met at once.
Knowledge and guidance
Read planning an energy improvement project and building management systems explained. Official guidance provides the relevant context for this service. Browse the Knowledge Centre.