Black & White Facilities / Service brief
Passenger and Goods Lifts
Assess passenger and goods lifts against the way the building needs to move people and loads. Recurring failures, changes in use or a new operational requirement need a clear history, so the chosen work addresses the actual installation and its intended purpose.

Overview
Identify the passenger and goods lifts at each property separately. Where the estate has recurring faults, retain local use, history and restrictions because matching symptoms can have different causes.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

What the work can include
Check the lift’s type, rated capacity and operating use, then assess the relevant drive, door and control systems. Define options for servicing, repairs or replacement. Specify which assets or areas are covered, the exclusions and the record required at completion.
Connect the assessment to existing lift and property references. Findings can then inform budgets, repeat instructions and later inspections of the same installation.
Important decisions
A load rating does not by itself show that a lift is right for a task. Moving passengers, goods or both brings different requirements.
Before we visit
Include the manufacturer, model, authorised use and maintenance record, together with the people or loads that need transport.
Confirm the local contact, technical approver and recipient of the action report. Resolve permits, shutdown arrangements and coordination with other contractors before attendance is scheduled.
How the work proceeds
Review demand and the installation together before choosing the work required. Coordinate the lift work with electrical systems and building interfaces.
Agree which buildings will be visited first and how significant findings will be escalated. Keep remaining lift actions visible even where other work at the property has been completed.
What affects cost and timing
Cost reflects the distance travelled, landing count, capacity, shaft limitations and equipment that will stay in place. The initial records and enquiry show what can be priced immediately and where a site assessment is needed.
Suitable tasks may be grouped around building access periods, but each site’s operational dependencies still need checking. Agree the route for reporting additional findings and establishing the cost of further work.
Applications across sectors
Plan around the people or goods the lift is intended to carry. Care and residential occupants may depend on it, warehouses need appropriate loading and goods movement, and public buildings need protected pedestrian routes during work. Describe the actual use and explore the sector range.
Locations covered
Passenger and goods lift work covers Northumberland, Tyne and Wear, County Durham and Tees Valley, including Newcastle upon Tyne, Gateshead, Sunderland, Durham, Darlington and Middlesbrough. The location directory extends to other towns and communities. Send every estate address and its local access contact.
Frequently asked questions
Can a goods lift be used for passengers if it has enough capacity?
Only where passenger use forms part of the lift’s design and authorisation. A sufficient load rating does not establish permission to carry people.
What information should I send about passenger and goods lifts?
Identify the make, model and rated purpose, and attach the service history. Describe the passengers or loads to be moved, give the location and explain whether you need diagnosis, a repair decision or a programme of work.
What affects the price and programme?
Travel distance, the number of landings, rated capacity, shaft constraints and retained equipment shape cost. Authorise further investigation or additional tasks only after defining their scope.
What should the completion information explain?
Identify the lift or areas covered, tasks undertaken and checks completed. Record limits and unfinished actions with the asset and property references that subsequent inspection or maintenance teams will use.
Useful guidance and records
Consult what statutory inspections does a commercial building require when deciding how inspections and records fit the instruction. Remedial-action tracking follows a defect through to evidenced closure, and official guidance provides the wider technical and management context.
Related work and your next step
The Lifts and Lifting Equipment overview sets out related equipment, including Dock Levellers and Loading Bays. Link continuing requirements to maintenance, larger planned alterations to projects, or browse the complete services offering.
Give Black & White Facilities the lift or site schedule, existing findings and operating requirements. Establish reporting and the division of responsibilities alongside the work scope. Make an enquiry.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.