Black & White Facilities / Service brief
Bird Control
Bird activity around entrances, roofs and service areas needs assessment before a management method is selected. Facilities teams should record the location, pattern of use and any nesting evidence, then establish the species and lawful options alongside access, cleaning and building-repair requirements.

Overview
Explain where fouling, roosting or entry is affecting the operation and what needs to change. Include users affected and altered building use so the assessment considers the present problem rather than assuming an earlier deterrent remains suitable.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

What the service can include
The instruction may cover an activity survey, deterrent or exclusion options and access planning, with cleaning and repair interfaces identified. Specify the surfaces affected and future upkeep of protection. Contamination cleaning and removal require their own defined scope where needed.
What to consider
Wild birds, eggs and nests are legally protected. Whether a licence is necessary, and whether its conditions can be satisfied, depends on the species, situation and intervention. A general building instruction does not authorise interference with an active nest.
Our proposal distinguishes the bird-management instruction from duties retained by the site or property team. Give associated repairs and specialist activities clear owners and scopes, including who makes arrangements and receives the resulting records.
Before we visit
Provide plans, roof details, observations and records of previous protection. Identify public circulation, roof access and the repair coordinator. Survey considerations include nearby features and whether the approach could displace activity to another part of the premises.
How we help
Findings establish suitable management options before protection or treatment is specified. The work plan records access provisions, restrictions and legal requirements. Handover identifies addressed areas, future inspections and defects in the building that remain outstanding.
Across several properties, consistent escalation and reports should retain each building's operating requirements and local contacts. Assign every action to its location and identify the decision route where implications extend across the estate.
What affects cost and timing
Price reflects the area, height, access method, protection selected and preparation. Separate roof repairs, cleaning and inspection duties, and schedule the intervention around the bird activity and the timing legally available for that work.
Tell us when the premises must remain operational and which periods are most sensitive. Phasing, extra access arrangements and the required management reports should be allowed for in the proposed timing and cost.
Sector applications
For Offices, consider staff and visitors near the working area. Trading and deliveries shape arrangements in Retail, while guest spaces and food operations influence Hospitality. Access at education needs to fit teaching. The wider offering covers all sectors, with working methods coordinated around site use.
Local coverage
Bird-management enquiries can relate to Northumberland, Tyne and Wear, County Durham or Tees Valley sites. Coverage includes Berwick-upon-Tweed, Alnwick, Morpeth, Hexham, Newcastle, Gateshead, Sunderland, Durham, Darlington, Hartlepool, Stockton-on-Tees and Middlesbrough; view all locations.
An estate brief needs the contact and working limitations at each address. Keep individual roof and access conditions visible within any common management arrangement.
Frequently asked questions
Can an active nest simply be removed?
Removal cannot be assumed lawful. Establish the species, circumstances and applicable legal position before undertaking anything that affects the nest.
Will deterrents need maintenance?
Plan inspection and upkeep to suit the protection's design and position, with access and repair duties included in the instruction.
Does cleaning fouling solve the bird problem?
Removing contamination may leave entry or roosting conditions unchanged. Consider the building features together with the bird activity.
Can one plan cover an estate?
Estate-wide reporting can be shared, but species, use of the building and access still require assessment at each location.
Knowledge and guidance
Read planning commercial pest control for how assessment and follow-up responsibilities fit together. Bird protection, surveys and licensing context is supplied by Official guidance; further resources sit in the Knowledge Centre.
Related services and your next step
Bird work may connect with Pest-Control Services and Pest Proofing. For building-related tasks, explore maintenance and Minor Works, or review the wider services and projects directories.
Contact Black & White Facilities with observations, affected roof or entrance areas and available site records. Include access restrictions and the required outcome so the lawful next step and scope can be assessed.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.