Black & White Facilities / Service brief
Pest Proofing
Proofing needs to follow the pest's route through the building, including connected gaps and voids. A facilities repair brief should identify the entry points and required barriers while protecting ventilation, drainage, fire protection and the access needed to maintain the surrounding services.

Overview
Set out where recurring activity affects the premises and the outcome required from repairs. Include recent changes in building use and affected occupants so the survey considers the current entry problem rather than only the first visible opening.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

What the service can include
The work identifies access routes and suitable barriers, repairs or changes following inspection. Specify location, material and finish, along with cleaning or active control needed first. Completion records should show treated areas and routes still unresolved or inaccessible.
What to consider
Exclusion details must preserve ventilation, drainage, fire protection and maintenance access. Openings around services can need a designed repair, particularly within protected building elements; an improvised filler may not suit the surrounding construction.
The proposal distinguishes the proofing assigned to us from responsibilities retained by the property team. Supporting repairs and specialist interfaces receive their own scope, owner and record requirements so the overall instruction remains clear.
Before we visit
Supply pest reports, drawings and known entry points, identifying service routes, loading spaces and current building works. Agree coordination with maintenance trades and how subsequent inspections will check the completed exclusion measures.
How we help
The survey connects evidence with likely routes and specifies repairs. Sequence work alongside active control where needed, recording each completed location. Handover identifies further observations and the upkeep needed for doors, screens and barriers.
Where proofing spans an estate, consistent reporting should preserve building-specific contacts and operating requirements. Tie actions to the appropriate location and name the route for decisions affecting the broader maintenance operation.
What affects cost and timing
Opening numbers and types, access, background condition and specialist interfaces influence cost. Door adjustment, roof-void repairs and riser work have different needs. Include preparation and making good in the scope to achieve a complete, durable repair.
Identify activities that cannot stop and periods when access is constrained. Phased repairs, extra access provisions and the reporting needed by the operations team should be reflected in pricing and sequencing.
Sector applications
Proofing at Offices needs staff and visitor movements considered. Trading and deliveries affect Retail; guest spaces and food activity shape Hospitality. In education, arrange access around teaching. Our broader work covers all sectors, using actual site operations to define the working arrangement.
Local coverage
Building proofing falls within our coverage of Northumberland, Tyne and Wear, County Durham and Tees Valley. Locations include Berwick-upon-Tweed, Alnwick, Morpeth, Hexham, Newcastle, Gateshead, Sunderland, Durham, Darlington, Hartlepool, Stockton-on-Tees and Middlesbrough; use all locations to review the area.
An estate proofing schedule needs a contact and working limits for every address. Retain the differences between buildings instead of allowing a common brief to conceal them.
Frequently asked questions
Does proofing remove an existing infestation?
Closing routes alone does not remove established activity. The order of proofing and active control may need to be coordinated.
Can every gap be filled with the same material?
Select the detail for the pest, exposure, building function and adjoining construction; one filling material cannot be assumed suitable everywhere.
Why do repaired buildings still need monitoring?
Later alterations, damage, open doors and deliveries can introduce new routes. Continued observation helps identify those changed conditions.
Can proofing form part of planned maintenance?
Proofing can join the maintenance programme by including vulnerable areas, doors and screens in the appropriate inspections and repairs.
Knowledge and guidance
Responsibilities across inspection, treatment and follow-up are explained in planning commercial pest control. Consult Official guidance for the relevant prevention context and the Knowledge Centre for additional guidance.
Related services and your next step
Proofing can be coordinated with Pest-Control Services and Commercial Pest Management. Repairs may also connect to maintenance or Minor Works; the full services and projects directories show the wider offering.
Use Contact Black & White Facilities to send the affected buildings, pest reports and known openings. Include the intended outcome and access limits so repair responsibilities and the next assessment can be established.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.