Black & White Facilities / Service brief
Rodent Control
Rodent evidence needs a location and time record so the investigation can follow likely routes beyond the first affected room. Facilities managers should connect treatment with proofing, waste and stock decisions, keeping findings and follow-up actions together for the responsible building team.

Overview
Describe the impact on occupied areas, food or stock and the result required. Identify changes in use and the affected premises so the assessment can consider service voids, waste areas or shared spaces where relevant.
Our full service catalogue, including every individual service, is available across every listed sector and location. For one site or several, we agree the scope, access and programme around the buildings concerned.

What the service can include
Inspection, activity assessment, appropriate control and follow-up monitoring form the scope. Waste, housekeeping and proofing actions sit alongside treatment. Reports track findings over time, giving subsequent attendance a purpose based on the evidence.
What to consider
The method must take account of people, pets and non-target wildlife. Rodenticide use is governed by product authorisation, directions and relevant professional stewardship requirements. A sighting does not automatically justify poison as the selected response.
Our instruction sets out control work and the responsibilities that remain with the site team. Give associated repairs and specialist activities separate scopes, including who arranges them and which records support completion.
Before we visit
Provide plans, previous reports and sightings with waste and delivery details. Identify food handling, sensitive work and access restrictions. Allocate responsibility for proofing recommendations and decisions about affected areas or stock.
How we help
Inspection establishes evidence and routes before the plan is agreed. Prevention, monitoring and treatment are coordinated; handover records the activity, measures, restrictions and next visit or action. Retain those reports with the property's records.
Estate-level reports and escalation can follow a consistent approach while keeping local contacts and operating conditions. Attribute actions to the correct premises and provide a named decision route for issues affecting the wider operation.
What affects cost and timing
The spread of activity, layout, access and chosen controls affect pricing. Proofing and further visits may need separate provision. A quotation should set out sequence and reporting without suggesting one attendance resolves every infestation.
State which operations must continue and the periods where disruption matters most. Account for phasing, additional access arrangements and management reporting in both the proposed programme and its price.
Sector applications
Rodent work in Offices needs coordination with staff and visitors; Retail adds trading and deliveries. Include guests and food operations in the Hospitality brief, and teaching-related access limits for education. The full offering supports all sectors, with arrangements informed by each building's activity.
Local coverage
Rodent-control coverage includes Northumberland, Tyne and Wear, County Durham and Tees Valley. From Berwick-upon-Tweed, Alnwick, Morpeth and Hexham, the area extends to Newcastle, Gateshead, Sunderland, Durham, Darlington, Hartlepool, Stockton-on-Tees and Middlesbrough; see all locations.
Provide a local owner for the requirement and the working restrictions at every property. A single estate instruction should still show the differences affecting individual buildings.
Frequently asked questions
Is bait always used for rodent control?
Bait is not automatic. Assessment determines an appropriate combination of monitoring, preventive action and suitable control measures.
Can entry gaps be sealed immediately?
Assess closure timing with the active-control plan and building layout. Route sealing should be coordinated rather than undertaken without considering the wider sequence.
Why might activity return after treatment?
Food, entry routes or activity nearby may still contribute. Reporting should link the treatment findings to the prevention work left to complete.
What records help a food-site manager?
Keep location-specific activity, measures, follow-up findings and assigned prevention tasks with the site's food-safety arrangements.
Knowledge and guidance
Review planning commercial pest control for responsibilities from inspection through follow-up. Rodenticide-use context is available in Official guidance, and the Knowledge Centre provides further supporting material.
Related services and your next step
Consider Pest-Control Services and Pest Proofing when joining treatment to prevention. Building work may require maintenance or Minor Works; use the wider services and projects directories to define associated scopes.
Contact Black & White Facilities with sighting records, affected locations and the operational requirement. Include working restrictions and available reports so the control scope and next action can be assessed.
Discuss the scope
Tell us what needs attention.
Share the site, the issue and any access requirements so we can discuss the next step.