The register is the index and action view. Inspection reports, assessments and other source documents remain the supporting evidence, linked to the relevant entry.
Start with the property and its responsibilities
Identify the building's use, occupied areas, equipment and operating arrangements. Establish the boundaries between owner, occupier, managing agent and service providers using the relevant property and appointment documents.
Then establish which requirements apply, using the site's assessments and competent specialist advice. Record the basis for each entry. This makes the register easier to review when equipment, use or responsibilities change.
Fields that make the register useful
One entry can link to several documents. Keep each document's date and scope visible so an older report for a different asset is not mistaken for current evidence.
Build the register in five steps
- Gather the baseline. Collect existing registers, assessments, schedules, reports and known open actions.
- Reconcile the scope. Check that asset and site references match and identify missing or duplicate records.
- Confirm requirements. Record the source, responsible party and timing basis for each activity.
- Separate status from findings. Show an inspection as completed while keeping its outstanding remedies open.
- Agree maintenance of the register. Define who updates it after visits, receives new reports and follows up exceptions.
For example, an inspection report may cover the main building but exclude a locked plant room. Record the inspected scope and the excluded area separately, then assign the access and follow-up action. Uploading the report should not conceal the uninspected area.
Keep exceptions visible
Useful status labels include due, arranged, evidence awaited, action open and complete. Define what each means. A single green indicator can hide the difference between a document received and a finding resolved.
Review approaching dates, overdue actions and missing evidence with the responsible contacts. HSE describes health and safety management as an ongoing cycle of planning, action, checking and improvement in its management guidance.
Review after changes
Update affected entries when assets are replaced, areas change use, responsibility transfers or a specialist identifies a different requirement. Preserve superseded records and the reason for the change so the history remains understandable.
The timing basis matters. For work-equipment inspections, HSE says the need and frequency should be determined through risk assessment; it also explains the records required. See HSE's work-equipment inspection guidance.
Common questions
Can a spreadsheet be used?
Yes. It needs consistent references, clear ownership, reliable document links and controlled updates. The important test is whether users can find the current position and follow outstanding actions without conflicting copies.
What if an inspection certificate is missing?
Record the evidence gap and assign a recovery or investigation action. Where work equipment requires inspection, do not use it unless the inspection is known to have taken place, as explained in HSE's inspection guidance. Escalate any operating restriction to the responsible site contact while the position is checked. For other missing documents, establish the specific requirement and appropriate action with the relevant provider or specialist.
Does a completed register prove the building is compliant?
No. It organises the requirements and evidence within its scope. The underlying assessments, work and findings must support the status shown, and changes at the property need continued review.
Should landlord and tenant tasks share one register?
They can be shown together where this helps coordination, provided their responsibilities and access to information remain clear. Each task still needs the correct owner and supporting source.
Put the register to work
Connect Compliance Management with Statutory Maintenance and Compliance Remedial Works. Read what remedial-action tracking involves.