
How Often Does a Commercial Property Need an EICR?
Plan commercial EICR inspections from installation evidence, applicable requirements and a register that keeps remedial deadlines visible.
Read the guideKnowledge Centre / The reading room
The building journalElectrical services take in fixed wiring, distribution boards, lighting, emergency lighting and portable appliances, and each has its own inspection and testing routine. The guides in this category help facilities managers and compliance leads plan test intervals, make sense of a report and decide what needs attention before the next inspection falls due.
Find your next read
Plan commercial EICR inspections from installation evidence, applicable requirements and a register that keeps remedial deadlines visible.
Read the guideThe reading room
Practical reading for the next decision.
Search by the job, the problem or the question.
10 guides to explore · Showing 10

Plan commercial EICR inspections from installation evidence, applicable requirements and a register that keeps remedial deadlines visible.

Distinguish emergency-light test types and plan site-specific frequencies, recharge time, reporting and repair follow-up.

Plan portable-equipment checks around risk and use, with clear ownership of shared items, failures and maintenance records.

Record circuit-trip evidence safely and distinguish protective-device operation, fault diagnosis and the repair required.

Commission a lighting survey that records condition, actual use, controls and the evidence needed for a practical upgrade scope.

Define EICR inspection coverage, plan access and outages, and retain findings with the evidence of completed remedial work.

Scope thermal imaging around electrical loads, safe access and interpretation, then connect temperature findings with investigation.

Manage electrical make-safe attendance with clear restrictions, follow-on repair instructions and an evidenced return to use.

Plan fixed-wire testing across managed premises, including isolation, tenant access, report limitations and a traceable electrical action plan.

Assess distribution-board repair or replacement with clear electrical findings, shutdown planning and a complete handover scope.
Browse services, maintenance, projects, sectors and locations.
Contact Black & White Facilities with the location and requirement. An enquiry is assessed before work or availability is confirmed.