Black & WhiteFacilities

Knowledge Centre / The reading room

The building journal

Plumbing and Drainage Guides

Hot and cold water systems, thermostatic mixing valves, water temperatures and legionella control on one side; drains, grease traps, blockages, pump stations and drain surveys on the other. The guides help facilities and property managers recognise the early signs of a water or drainage problem, understand what routine checks are for and give a contractor the information needed to trace a fault.

Find your next read

The reading room

Find a useful guide.

Practical reading for the next decision.
Search by the job, the problem or the question.

10 guides to explore · Showing 10

About this topic

Related routes

Browse services, maintenance, projects, sectors and locations.

Need a site-specific answer?

Contact Black & White Facilities with the location and requirement. An enquiry is assessed before work or availability is confirmed.